Parts List
Frame
A1 Side Frames
Parts:
A2 Bars
A3 Pulley Bars
A4 Side Base Frames
Additional
Light Fixtures
Parts:
T-8 Light Tubes
Poly Tray
Hardware:
Ball Chains
Chain Connectors
Split Rings,Large
Split Rings,Small
Bolts
End Plugs
T
here are four parts to assembling the
SunLite Garden: Frame Assembly, Ball
Chain Assembly, Adjusting the Fixtures, and
Installing the Light Tubes. With the help of
one other person, you can assemble the SunLite
Tabletop Garden in less than an hour. The only
tools you'll need are a Phillips screwdriver, a
hammer or rubber mallet, and pliers.
Frame Assembly
Step 1. Lay out all Frame Parts on a flat, clean
surface.
Step 2. Connect an A4 Side Base Frame to the
end of each A2 Bar using two Phillips-head bolts
(Fig 2). Repeat this step to connect the second A4
Side Base Frame to the other end of the A2 Bars.
Do not fully tighten the bolts on the frame until
Step 4.
Step 3. Connect the A1 Side Frames to the A4
Side Base Frames by placing a Phillips-head bolt
up through the hole in the underside of the A4
Frame. Make sure the nylon cleat on each A1 Side
Frame is facing out (Fig. 2).
SunLite® Tabletop Garden
Assembly Instructions
Qty.
2
2
1
2
1
3
1
2
4
2
2
8
6
Fig. 1
Light Fixture
A2 Bar
Fig. 2
A2
Bars
A1 Side Frame
with Cleat
A4
Side
Base
Frame
Enlarged
view of
cleat
A1
Side
Frame
A4 Side
Base Frame
Bolt
Bolts