Program Operation - LG AT&T GR500 Service Manual

Table of Contents

Advertisement

11. Stand-alone Test

11.3 Program Operation

1) X-CALMON Program Overview
When trying to test the mobile phone, the service engineers make a configuration of calibration
environment like previous figure. And if you finish making configuration, please execute the X-
CALMON program. Running the X-CALMON program, you will see X-CALMON program
window like below.
If X-CALMON program would be executed, it checks the connection of instruments and
initializes them automatically.
X-CALMON supports following functions.
- Test of GSM850,EGSM900, DCS1800, PCS1900 and WCDMA band2,5
- Instrument (Agilent8960) control
- USB and UART (Board JIG for UART communication is needed) communication with
mobile phone
X-CALMON has three windows and each window support different function.
- Command window which supports interactive ITP commands like Hyper terminal
- Calibration and Test (Non Signal) tree window
- Quick Command mode window
LGE Internal Use Only
Figure 11-3. X-CALMON program window
- 192 -
Copyright © 2009 LG Electronics. Inc. All right reserved.
Only for training and service purposes

Advertisement

Table of Contents
loading

Table of Contents