Download Print this page

Electrical Connections - OERTLI PK 550 Assembly Instructions Manual

Fuel oil/gas boilers
Hide thumbs Also See for PK 550:

Advertisement

58 R control panel
Installing the bulbs
Fix the control panel to the rear of the control panel bracket using 2 screws (H Ø 4 x 40) and serrated washers.
Carefully unroll the various bulbs and bring them out of the control panel through the opening in the bottom on the panel.
59
Cut out the top insulating material to free the boiler pocket. Then, insert the bulbs inside the pocket and maintain them with the spring.
60

Electrical connections

All connections are made with the terminal boxes designed for that purpose on the back of the boiler's command board.
See the "Electrical Connections" section of the instructions supplied with the control panel.
18/03/2016 - 300020196-02
PK 550
2. Mounting PK 550
53

Advertisement

loading