Retsch BB200 Operating Instructions Manual

Retsch BB200 Operating Instructions Manual

Jaw crusher

Advertisement

O p e r a t i n g I n s t r u c t i o n s
B B 2 0 0 J a w C r u s h e r
Retsch GmbH, Retsch-Allee 1-5, 42781 Haan, Germany 5/4/2012 0004

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BB200 and is the answer not in the manual?

Questions and answers

Summary of Contents for Retsch BB200

  • Page 1 O p e r a t i n g I n s t r u c t i o n s B B 2 0 0 J a w C r u s h e r Retsch GmbH, Retsch-Allee 1-5, 42781 Haan, Germany 5/4/2012 0004...
  • Page 2: Information On These Operating Instructions

    Each of the individual chapters is a self-contained unit. These operating instructions do not contain any information on repairs. If repairs should ever become necessary, kindly get in touch with your supplier or contact directly the Retsch GmbH. 04/05/2012 Retsch GmbH...
  • Page 3: Table Of Contents

    Grain size of feedstock product ..............15 Properties of the product being ground ............15 Fill volume ......................15 General ....................16 Cleaning ......................16 Maintenance ......................17 Functional inspections ..................17 Replacing the breaker jaws ................18 Copyright ......................18 Modifications.....................18 Safety instructions (table) ................19 Appendix ..............following pages 04/05/2012 Retsch GmbH...
  • Page 4: Safety

    Anyone who deals with the machine in any capacity whatsoever. The BB 200 is a modern, high-performance product manufactured by the Retsch GmbH, incorporating engineering representing the state of the art. It is entirely safe in operation, provided that the operator is familiar with the present technical manual and uses the machine for the purpose for which it was intended.
  • Page 5: Warnings

    Repairs These operating instructions do not include any repair instruc- tions. In the interest of your own safety, have repairs made only by the Retsch GmbH or an authorized representative (service technician). In this case, please notify the following: Local Retsch representative...
  • Page 6: Technical Specifications

    // coke // corundum // quartz // salts // refractory clay // slag // silicates // silicon // sintered materials // cement clinker, etc. Do not make any modifications to the machine and use only RETSCH approved spares and accessories. Failure to comply will invalidate the CE declaration and guarantee.
  • Page 7: Noise Emissions

    • Ensure suitable sound-proofing measures or wear hearing protection. Equipment dimensions (approximate) Height: 1160 mm Width: 450 mm Depth: 900 mm Weight: 300 kg net Footprint 450 mm x 900 mm; no safety clearances required! 04/05/2012 Retsch GmbH...
  • Page 8: Shipping And Installation

    50% relative humidity at 40°C. At higher humidity, the electronic and mechanical components may be damaged, and performance data changed to an unknown extent. Installation site – altitude max. 2000 m above mean sea level 04/05/2012 Retsch GmbH...
  • Page 9: Installation

    When connecting the power cord to the power source, be sure that the supply circuit is fused in accordance with local codes. Fig. 1 Failure to observe the values on the data plate can cause damage to either the electrical or the mechanical components or both. 04/05/2012 Retsch GmbH...
  • Page 10: Operation

    Operation Target group: Operators Control elements and their use Schematic view of the operating controls , part 1: Side view 04/05/2012 Retsch GmbH...
  • Page 11: Control Elements And Their Use

    Control elements and their use Schematic view of the operating controls, part 2: Front view 04/05/2012 Retsch GmbH...
  • Page 12: The Operating Controls And Their Functions

    The breaker jaw J is mounted here; the gap width can be Breaker arm, stationary modified by adjusting the threaded spindle O. The breaker jaw J is mounted here; executes the grinding Breaker arm, moving motion required for size reduction without manual effort 04/05/2012 Retsch GmbH...
  • Page 13: Starting The Bb 200

    C from time to time. To achieve the maximum fill level in the drawer, it is necessary to shake it back and forth occasionally, without displacing the drawer by more than 30 mm. Fig. 3 Fig. 3 04/05/2012 Retsch GmbH...
  • Page 14: Adjust The Gap Width

    If the grinding chamber W is filled more than 2/3 full, then the guide plates of the fill hopper could be damaged; the moving breaker arm would force the product into the crusher housing, behind the breaker arm. 04/05/2012 Retsch GmbH...
  • Page 15: Working Instructions

    Fig. 6 If the grinding chamber W is filled more than 2/3=800ml full, then the fill hopper guide plates could be damaged; the moving breaker arm would force product into the crusher housing, behind the breaker arm. 04/05/2012 Retsch GmbH...
  • Page 16: General

    Do not use running water to clean the BB 200. Hazard of fatal electrical shock. Using solvents is prohibited since the felt seals at the sides of the breaker arms could be damaged and/or grease packings could be washed out. 04/05/2012 Retsch GmbH...
  • Page 17: Maintenance

    The BB 200 stops completely. Pull down and close the filling hopper B. The BB 200 must not start up again. Close the toggle clamp F on the filling hopper B. Start the BB 200. Fig. 9 04/05/2012 Retsch GmbH...
  • Page 18: Replacing The Breaker Jaws

    Hazard of pinching fingers and hands! Copyright Reproducing or distributing this documentation, utilizing or distributing the contents is permitted only with the express consent of Retsch GmbH. Non-compliance will subject violators to claims for damages. Modifications Subject to modification without prior notice.
  • Page 19: Safety Instructions (Table)

    In the case of the delivery being incomplete Later complaints can under certain circumstances and/or transport damage, you must inform the no longer be considered. carrier and Retsch GmbH immediately (within 24 h). Environmental temperature Drops below 5°C Electronic and mechanical components can Rises above 40°C...
  • Page 21 Authorized person for the compilation of technical documents: J. Bunke (technical documentation) The following records are held by Retsch GmbH in the form of Technical Documentation: Detailed records of engineering development, construction plans, study (analysis) of the measures required for conformity assurance, analysis of the residual risks involved and operating instructions in due form according to the approved regulations for preparation of user information data.
  • Page 24 Copyright ® Copyright by Retsch GmbH Haan, Retsch-Allee 1-5 D-42781 Haan Federal Republic of Germany...

Table of Contents