Operating instructions CLIMACELL Page 1 CONTENTS 2.8..2002 GENERAL NOTES......................... 3 IMPORTANT INSTRUCTIONS ...................... 3 2.1 U ........................ 3 NPACKING AND CHECK 2.2 B ....................4 EFORE PUTTING INTO OPERATION 2.3 P :........................5 ERMITTED LOADS 2.4 W ....................5 IRING AND OTHER CONDITIONS SPECIFICATIONS OF THE COOLING INCUBATOR WITH CONTROLLED HUMIDITY....
Page 3
Operating instructions CLIMACELL Page 2 4.8.1 Set P4 ..........................19 4.8.2 Set the segment for T1 ....................20 4.8.2.1 Set temperature T1 ........................20 4.8.2.2 Set the delay time of T1 : ......................20 4.8.2.3 Read out of T1 and the delay time: ................... 20 4.8.2.4 Set the ramp at T1 :........................
Operating instructions CLIMACELL Page 3 1 General notes The unit CLIMACELL should be used in applications, in which changing the temperature in a sample in range from 0 °C to 99.9 °C and the relative humidity (RH) from 10 % to 95 % in various time modes is needed.
Operating instructions CLIMACELL Page 4 Before putting into operation CLIMACELL is designed and produced in accordance with EN 50081-1, 55011, 50082-2, 61000-4-2, 61000-4-4, ENV 50140, 50141, meets requirements of EU directions 89/336/EEC, 73/23/EEC, and is individually tested according to EN 61010-1. ♦...
Operating instructions CLIMACELL Page 5 ♦ Shifting the upper sheet of the inner chamber out and in must be carried out carefully, there is a danger of cutting the chamber seal through as a consequence of careless manipulation. ♦ If the unit operates with a temperature higher than 70°C, take a special care when opening the door.
Operating instructions CLIMACELL Page 6 3 Specifications of the cooling incubator with controlled humidity General view Mains switch 12 Quick coupler – ring for disconnecting Control panel 13 Quick coupler – part I Plastic body of the regulator 14 Unit of the magnetic treatment of input water from the distribution system Condenser 15 Boiling vessel for steam generator...
Operating instructions CLIMACELL Page 7 3.1.1 Useful space Useful space - see the illustration. in the following picture, where X(H) = X(D) = 10 % of the chamber depth, X(Š) = X(W) = 10 % of the chamber width, X(V) = X(H) = distance of the bottom shelf to the bottom of the chamber.
Operating instructions CLIMACELL Page 8 Operating panel key of activation of setting-up mode 2/4 cursor steering turning to the left/right setting-up value in parameter key starting the program switch (ON - on, OFF - stand by) indicator light - shines after switching on the switch indicator light heating - shines: state of temperature regulator - heating active indicator light cooling - shines: state of temperature regulator - cooling active 10 indicator light –...
Operating instructions CLIMACELL Page 9 4 Function and operating Function of individual indicator lamps and control keys is described in chapter Description of the unit in paragraph Control panel. Connecting to the water source and drain a) the water source is a plastic container (ca. 50 l) with a submersible pump, filled with distilled water Unpack the container and: connect the cable connector to the corresponding socket in the rear part of the upper...
Operating instructions CLIMACELL Page 10 Parameter change: Move the cursor horizontally by pressing ◄► . Change the parameter above the cursor by pressing ▲. General setup of CLIMACELL CLIMACELL – MMM’ s product – offers a wide range of customer’s benefits. In order to make them active, there are fundamental inputs required.
Operating instructions CLIMACELL Page 11 The procedure is as follows: By pressing START/STOP you enter the program restoring service at first. The choices P1 – P6 are available. Select by pressing ▲. To record the program press button (In detail: Before the start: the display indicates: „Service 02“ „Load from CCard“...
Operating instructions CLIMACELL Page 12 4.4.6 Service 05 – Select language Pressing START/STOP you enter the service. To select the language use button ▲ . To quit the service press START/STOP again. 4.4.7 Service 06 – Setting the switching time of the inner socket (optional) With help of this service you can set the time of the inner socket periodic switching on and off.
Operating instructions CLIMACELL Page 13 4.4.9 Service 08 – Selecting the water quality Enter the service by pressing START/STOP. On the upper line of the display: „Water Quality“ On the lower line switch over by pressing ▲: either „Tap Water“ or „Destilled Contai“. Conform the setting by pressing START/STOP and quit the service 08.
Operating instructions CLIMACELL Page 14 depress X/W and put the cursor to the position of RH units, set 9, go to the position of RH tens and set the further value over 9 – this position is OFF. 4.4.13 Setting the operating conditions of temperature and relative humidity and their limitations Relation between the operating temperature (T °C) and the operating relative humidity (RH %) in setting the operating parameters of the cabinet is shown by the enclosed diagram.
Operating instructions CLIMACELL Page 15 Program P1 A constant temperature and a constant value of RH is required. P 1 = The cabinet is working fluently at the set temperature and RH until the unit is switched off. 4.5.1 Set P1 Put cursor to the position Program with help of ◄►...
Operating instructions CLIMACELL Page 16 4.5.4 Information on the set parameters during the device’s running: Press and all information on the set parameters are shown at once. All possible parameters in all possible programs can be set including the one which is presently active, as long as the change is effective.
Operating instructions CLIMACELL Page 17 4.6.3 Start P2 Press START/STOP, a sound will appear and the “windmill“ in the first digit of LCD starts running clockwise. See the following LCD read out: °C °C °C = actual temperature hh:mm = time to reach the set temperature, if the set-up is reached, the rest of the run down time is indicated.
Operating instructions CLIMACELL Page 18 paragraph Setting the operating conditions of temperature and relative humidity and their limitations. Caution! Do not reduce the ventilator rate if not necessary. The reduced ventilator rate could influence the regulation of temperature and RH negatively! 4.7.2 LCD - read out shown: 4.7.3 Start P3 Press START/STOP, a sound will appear and the “windmill“...
Operating instructions CLIMACELL Page 19 After the set temperature has been reached, the run down time is shown if the time of the procedure is unlimited. If the time is limited, the rest of the run down time is shown. 4.7.4 Information on the set parameters during the device’s running: See paragraph 4.2.4 4.7.5 Stop P3...
Operating instructions CLIMACELL Page 20 4.8.2 Set the segment for T1 4.8.2.1 Set temperature T1 Put cursor to the position Program and switch to P4. By pressing ◄► place the cursor on ¯ the graph and make sure that T1 ( / \_ ) is activated.
Operating instructions CLIMACELL Page 21 4.8.3 Set the temperature T2 : 4.8.3.1 Set the temperature T2 : Place the cursor on the graph and make sure that T2 ( /¯\ ) is activated. If not, activate with help of ▲. Change to the position °C – setting of the temperature – and set the temperature.
Operating instructions CLIMACELL Page 22 4.8.3.8 Setting the ventilator rate and RH at the temperature T2: Place the cursor at the position and set the ventilator rate between 00 to 100 %. Then set the required relative humidity between 10 % and 90 % at the position RH – with limitations given in diagram in paragraph Setting the operating conditions of temperature and relative humidity and their limitations.
Operating instructions CLIMACELL Page 23 4.8.4.2 S2 is active, T1 has been reached, delay time is running: °C °C °C = actual temperature hh:mm = dwell time at T1 running down towards zero 4.8.4.3 S3 is active, temperature is heading towards T2: °C °C °C = actual temperature hr:min = time running since the end of T1 till it reaches T2 4.8.4.4 S4 is active, T2 is reached, delay time at T2 is running:...
Operating instructions CLIMACELL Page 24 4.8.6 Stop P4 Press START/STOP. Program P5, P6 4.9.1 Description of P5 and its control The program consists of 16 segments. Segment 0 is for the delayed start, it is defined only by the time t0. If t0 is 0, there is no delayed start. Segments 1 to 15 are of the same qualities, each of them is defined only by the end temperature, time or speed (ramp), fan rotation speed and depending on the type of the unit also by relative humidity and chamber light.
Page 26
Operating instructions CLIMACELL Page 25 Display - state of the program selection A: P5 name of the program B: XX number of the set segment C: X type of the set segment: x time of the zero segment is set to zero, segment will be skipped over >...
Operating instructions CLIMACELL Page 26 Display - running of the program ∗ the rotating symbol and the program number B: XX the number of the relevant segment C: X the type of the set segment: > not the last, the end length - see E >I the last, the end length - see E ∞...
Page 28
Operating instructions CLIMACELL Page 27 If the cycle selection is active on LCD at the moment of the start, see fig. Display - state of the program selection - E: cXX, the program comes again to the start after the last segment is over and the whole program is repeated.
Page 29
Operating instructions CLIMACELL Page 28 Display - running of the program ∗ the rotating symbol and the program number B: XX the number of the relevant segment C: X the type of the set segment: > not the last, the end length - see E >I the last, the end length - see E ∞...
Operating instructions CLIMACELL Page 29 0 4 > 0 4 . 0 T 0 0 : 0 0 1 0 0 O F F 0 5 >| 0 4 . 0 T : 0 0 1 0 0 0 F F Note: the printer prints RH OFF in segments 0, 1, 4 Setting in program P6 Start monday 30.10 at 08:00...
Page 31
Operating instructions CLIMACELL Page 30 Error 06 = steam generator overfilled (upper level indicator flooded for a longer time than three minutes) ∗ Error 07 = water supply interrupted (the filling valve has been opened for a longer time than 90 sec –...
Operating instructions CLIMACELL Page 31 4.11 Printing the protocol Printing the protocol with printer CITIZEN, model iDP 3110-24 RF-A. By setting the printer interval you give the time intervals of printing actual values of temperature in the chamber. Length of this interval is displayed in the head of the protocol. Printer interval can be set - see paragraph Basic Setting, point Service 04.
Operating instructions CLIMACELL Page 32 Heat the sensor to the temperature 130 °C (- 20 °C), the resistance measured on a functional safety thermostat = ∞, the resetting peg jumps out to the position OFF. In this way the function of the safety thermostat is verified. Clean the sensor, mount it back to the steam generator by following the reverse procedure, reset the thermostat with the resetting peg, mount the generator into Climacell, connect the cabinet to the mains.
Operating instructions CLIMACELL Page 33 Container for collecting the condensed water steam During the operation of the cabinet, especially in case of higher humidity, a condensate can be collected in the lower part of the space between the inner glass door and the outer door. The collecting container is hung under the opening in the outer chamber jacket.
Operating instructions CLIMACELL Page 34 6 Technical data Technical data Model volume Inner dimensions Chamber, stainless steel width depth height 1410 1410 Volume of the steam cca l space Trays, stainless steel number max./usual 10/2 19/2 19/2 Min. distance between trays Number of outer metal doors...
Operating instructions CLIMACELL Page 35 7 Warranty and service Warranty is guaranteed by MMM for satisfactory delivery and functioning of the ovens within the contractual regulations and the period of the warranty. MMM does not cover any deficiencies or damages due to normal wear and tear, chemical or physical attack, excessive overload, incorrect handling or due to the ovens being used in a way in which it was not intended to be used, particularly in case of non-observance of the enclosed operating instructions, incorrect installation resp.
Operating instructions CLIMACELL Page 36 10 Optional equipment 10.1 Inner lighting Inner space is illuminated with thermo-resistant bulbs - their switch is placed on the door. 10.2 Bushings of diameter 25, 50, 100 mm The bushings are normally placed cca in the middle of the side (right or left) wall of the chamber.
Operating instructions CLIMACELL Page 37 10.7 Potential-free contact for alarm reports It's outlet is placed in the connector in the rear foot, a voltage up to 24 V/ 1A can be connected to it. 10.8 The inner switched socket The socket is placed inside the chamber on the side wall. Details of the switching control see par.
Need help?
Do you have a question about the CLIMACELL 111 and is the answer not in the manual?
Questions and answers