Installation

In order to guarantee a correct functioning, we advise to install the sealer at a spot:
- where the machine has enough space for ventilation.
- where it is not exposed to direct sunlight or some other heatsource.
- where it is not subject to vibrations or shocks.
- that is dustfree.
Check if the on/off switch is off.
Connect the mains lead to the sealer first and than to an earthed socket with the correct
Mains voltage (according to type label at the rearside of the sealer).
Switch on the on/off switch.
During the heating-up the machine will mention in the display that the temperature is too low.
From the off-situation onwards it takes ± 5 minutes before the pre-set temperature (at 180°) is reached.
Two bleeps indicate that the adjusted temperature is reached.
The display will show the stand-by screen.
Feeding packages is possible now.
The transport starts automatically when a package is feeded- in.
Type label
Main supply
Fuses 2x 3.15AT
On/off switch
99.900.116 rev.: 2
REMARK
Input guide adjustment knob
for the seal seam position
24