Plan; Create A New Plan - Rapid RS-400 User Manual

Digital signage player
Table of Contents

Advertisement

4. Plan

With Plan option is providing user to control which Designs are displayed on what days and at what times
and how often by creating a Schedule.

4.1. Create a New Plan

A
A
Design list
B
Timetable
To create a new Plan please follow these steps:
Step 1: Click Plan from Main page of Player.
Step 2: Drag Design file from Design list and drop it onto Timetable.
Step 3: Double click the Plan of Timetable, then Plan dialog appears.
Step 4: To define the star and end date and time.
Step 5: Click Apply to confirm and close Plan dialog.
B

Advertisement

Table of Contents
loading

Table of Contents