Panasonic DMR-XW400EF Service Manual page 53

Table of Contents

Advertisement

9.2.2.
Upper base ass'y
1. Procedures 1,2 of "9.2.1. Disassembling of Traverse
Base Ass'y, Drive P.C.B. and SW P.C.B." is performed in
this section.
2.
is pushed with precision (-) screw driver and the Rail is
removed.
3. The precision (-) screw driver into and Cartridge spring
is pushed in the arrow direction while floating and then
remove it (as well as other side).
4. The Clamp cover is removed.
5. The 3 hooks are removed and then Magnet, Back york
are removed.
53

Advertisement

Table of Contents
loading

Table of Contents