Pcb Assembly Adjustment; Set Assembly Adjustment; Mac Address; Adjustment Instruction - LG 55LW5700 Service Manual

Hide thumbs Also See for 55LW5700:
Table of Contents

Advertisement

1. Application Range
This specification sheet is applied all of the LJ12C/D/E/F/N
LCD TV models, which produced in manufacture department
or similar LG TV factory
2. Notice
(1) Because this is not a hot chassis, it is not necessary to use
an isolation transformer. However, the use of isolation
transformer will help protect test instrument.
(2) Adjustment must be done in the correct order.
(3) The adjustment must be performed in the circumstance of
25 ºC ± 5 ºC of temperature and 65 % ± 10 % of relative
humidity if there is no specific designation.
(4) The input voltage of the receiver must keep AC 100-220
V~ 50 / 60Hz.
(5) Before adjustment, execute Heat-Run for 5 minutes.
After Receive 100% Full white pattern (06CH) then
A
process Heat-run
(or "8. Test pattern" condition of Ez-Adjust status)
How to make set white pattern
A
1) Press Power ON button of Service Remocon
2) Press ADJ button of Service remocon. Select "8. Test
pattern" and, after select "White" using navigation
button, and then you can see 100% Full White pattern.
* In this status you can maintain Heat-Run useless any
pattern generator
* Notice: if you maintain one picture over 20 minutes
(Especially sharp distinction black with white
pattern – 13Ch, or Cross hatch pattern – 09Ch)
then it can appear image stick near black level.
3. Adjustment Items

3.1. PCB Assembly Adjustment

MAC Address Download
A
Adjust 480i Comp1
A
Adjust 1080p Comp1/RGB
A
• If it is necessary, it can adjustment at Manufacture Line
• You can see set adjustment status at "1. ADJUST
CHECK" of the "In-start menu"
EDID (The Extended Display Identification Data)/DDC
A
(Display Data Channel) download

3.2. Set Assembly Adjustment

Color Temperature (White Balance) Adjustment
A
Using RS-232C
A
PING Test
A
Selection Factory output option
A
Copyright
LG Electronics. Inc. All right reserved.
Only for training and service purposes

ADJUSTMENT INSTRUCTION

- 12 -
4. PCB Assembly Adjustment

4.1. MAC Address

4.1.1. Equipment & Condition
• Play file: Serial.exe
• MAC Address edit
• Input Start / End MAC address
4.1.2 Download method
4.1.2.1 Communication Prot connection
RS-232C Po rt
Connect: PCBA Jig-> RS-232C Port== PC-> RS-232C Port
4.1.2.2 MAC Address Download
• Com 1,2,3,4 and 115200(Baudrate)
• Port connection button click(1)
• Load button click(2) for MAC Address write.
• Start MAC Address write button(3)
• Check the OK Or NG
4.1.3 Equipment & Condition
• Each other connection to LAN Port of IP Hub and Jig
PCBA
PC(RS-232C)
LGE Internal Use Only

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents