Equipment start-up
checklist
Receiving and inspection
Unit received undamaged
n
n
Unit received complete as
n
n
ordered
Unit arrangement and handing
n
n
is correct
Unit structural support is
n
n
complete and correct
Handling and installation
Unit mounted level and square
n
n
Proper access is provided for
n
n
unit and accessories
Proper chilled/hot water line
n
n
sizes to unit
All services to unit in code
n
n
compliance
Unit protected from dirt and
n
n
foreign matter
Cooling/heating connections
Connect field piping to unit
n
n
Pressure test all piping for leaks
n
n
Install drain lines and traps, as
n
n
required
Insulate all piping, as required
n
n
Ductwork connections
Install ductwork, fittings and
n
n
grilles, as required
Flexible duct connections at unit
n
n
Proper supply and return grille type
n
n
and size
Control outside air for freeze
n
n
protection
Insulate all ductwork, as required
n
n
Unit start-up
General visual inspection and
n
n
system inspection
Close all unit isolation valves
n
n
Flush water systems
n
n
After system has been flushed,
n
n
ensure all isolation valves are
open