Download Print this page

Sanyo VHR-390EX Service Manual page 4

Advertisement

MI-14212(I) 3/3
TEMPORARILY
SEITING
UP AND CONNECTING
MAIN
PWB ASSEMBLY
The following
is an example
of how to place and connect
the main PWB not requiring
a jig, when
repairing
the
CP-I PWB
assembly (Fig.
1.1.4)
1.
Place the mechanism main unit atthefixed
position on the
4.
Connect the TM-1 PWB Ass'yto operate the VCR by using
chassis.
the
remote
control,
and then
connect
the
12-pin
2.
Insert the VP-1 PWB Ass'y at the fixed position of the
connector to the CN511 for the PW-I PWB Ass'y.
mechanism uni~and connect the flat cable of the Cylinder
5.
Place the CP-1 PWBAss'yabovethe
mechanism main unit
Ass'y.
7'
along the cassette holder. Insert the tip (N) of the terminal
3.
Connect the 24-wire flat cable and the 2-pin connector to
board into the opening (0) at the side of the chassis, as
the MC-2 PWB, and then connect the 6-pin connector to
shown in the enlarge view.
the ACE head.
M-TP4H/GIT-4
,PW-I
PWB
ASS'Y
,.,
12-pinConnactor
/
VP-I PWB
kS'y
\
Ass'y
/
TN-5 PWB
Terminal Board
Ass'y
~ec~an~.a..ni-~~ssis '
Cassette Holder
Opening(0)
MC-2 PWB
Fig. 1.1.4
"d
–4–

Advertisement

loading

This manual is also suitable for:

Vhr-390Vhr 390sp