Advertisement

Quick Links

Version 3
Manual updates
Version
Date
1
10/03/11
2
20/03/11
3
10/04/11
F-DBS SAS, La Maison des Services, Av des 2 Lacs, Courtabœuf 7, 91971 VILLEJUST
, La Maison des Services, Av des 2 Lacs, Courtabœuf 7, 91971 VILLEJUST
, La Maison des Services, Av des 2 Lacs, Courtabœuf 7, 91971 VILLEJUST
Tél: +33 1 64 86 25 40 - Fax: +33 1 69 31 23 01 - email: info@f-dbs.com
Tél: +33 1 64 86 25 40
ZEROAIR User's Manual
ZEROAIR
User's Manual
Description
First draft
Update on figure dimensions and installations
Update reference to INLET and OUTLET
Site web:
www.f-dbs.com
1
dbs.com

Advertisement

Table of Contents
loading

Summary of Contents for ZERO AIR ALLIANCE V3

  • Page 1 Version 3 ZEROAIR User's Manual ZEROAIR User's Manual Manual updates Version Date Description 10/03/11 First draft 20/03/11 Update on figure dimensions and installations 10/04/11 Update reference to INLET and OUTLET F-DBS SAS, La Maison des Services, Av des 2 Lacs, Courtabœuf 7, 91971 VILLEJUST , La Maison des Services, Av des 2 Lacs, Courtabœuf 7, 91971 VILLEJUST , La Maison des Services, Av des 2 Lacs, Courtabœuf 7, 91971 VILLEJUST Tél: +33 1 64 86 25 40...
  • Page 2: Table Of Contents

    Version 2 ZEROAIR User's Manual ZEROAIR User's Manual INDEX Introduction ............................................4 Product Description ..........................................4 Safety instruction ..........................................4 Engineered System ..........................................5 Air Supply ............................................5 Dimensions and installation ..........................
  • Page 3: Introduction

    Zero Air Generator may be used as a source of fuel air for Flame Ionization Detectors (FID’s) or as a Zero Air Generator may be used as a source of fuel air for Flame Ionization Detectors (FID’s) or as a Zero Air Generator may be used as a source of fuel air for Flame Ionization Detectors (FID’s) or as a...
  • Page 4: Engineered System

    The Zero Air Generator requires a source of clean, dry compressed air (3 to 8 Ba The Zero Air Generator requires a source of clean, dry compressed air (3 to 8 Bar) for optimal operation. The r) for optimal operation. The...
  • Page 5: Dimensions And Installation

    Version 2 ZEROAIR User's Manual ZEROAIR User's Manual Dimensions and installation Dimensions and installation Dimensions A = 34cm (13”) B = 20cm (7.9”) C = 43cm (16,9”) Installation Figure 2 A > 15cm (6”) In order to ensure safe operation of the unit, the following steps must be taken In order to ensure safe operation of the unit, the following steps must be taken prior to prior to installation:...
  • Page 6: Overview And Connections

    Version 2 ZEROAIR User's Manual ZEROAIR User's Manual Overview and Connections Overview and Connections All connections, electric and pneumatic, are made at the back panel. Refer to follow Figure 3 electric and pneumatic, are made at the back panel. Refer to follow Figure 3 electric and pneumatic, are made at the back panel.
  • Page 7: User Interface

    Version 2 ZEROAIR User's Manual ZEROAIR User's Manual User interface Figure 6 The front panel has three LEDs : GREEN (1), YELLOW (2), RED(3) and a one button (4). Pressing ree LEDs : GREEN (1), YELLOW (2), RED(3) and a one button (4). Pressing ree LEDs : GREEN (1), YELLOW (2), RED(3) and a one button (4).
  • Page 8: Fid Models

    Version 2 ZEROAIR User's Manual ZEROAIR User's Manual FID Models The FID Models are without the top cover and it can The FID Models are without the top cover and it can be put under the H2 generator of the same be put under the H2 generator of the same product line.
  • Page 9: Maintenance

    Prior to servicing Zero Air Generator, turn off the compressed air and power supplies to the generator, and Prior to servicing Zero Air Generator, turn off the compressed air and power supplies to the generator, and Prior to servicing Zero Air Generator, turn off the compressed air and power supplies to the generator, and ensure that the system is depressurized.
  • Page 10: Packaging

    Version 2 ZEROAIR User's Manual ZEROAIR User's Manual Turn off the power switch (5). power switch (5). 11.3 Packaging List of the operations to be performed before packing the machine to return it for maintenance service: List of the operations to be performed before packing the machine to return it for maintenance service: List of the operations to be performed before packing the machine to return it for maintenance service: Stop the internal oven heating pressing START/STOP button(1).
  • Page 11 Version 2 ZEROAIR User's Manual ZEROAIR User's Manual Net weight(water tank empty) Connections Outlet port 1/8" Female Inlet port 1/8" Female Water purge 6mm(1/4) push fitting Ambient data Temperature 5-35° C (41-95° F) Humidity (max, non condensing) 80% at 25° C (77° F) Noise <25dB(A) IP rating...
  • Page 12 Version 2 ZEROAIR User's Manual ZEROAIR User's Manual NOTE : F-DBS SAS, La Maison des Services, Av des 2 Lacs, Courtabœuf 7, 91971 VILLEJUST , La Maison des Services, Av des 2 Lacs, Courtabœuf 7, 91971 VILLEJUST , La Maison des Services, Av des 2 Lacs, Courtabœuf 7, 91971 VILLEJUST Tél: +33 1 64 86 25 40 Tél: +33 1 64 86 25 40 - Fax: +33 1 69 31 23 01 - email: info@f-dbs.com dbs.com...

Table of Contents