norbar 60166 Operator's Handbook Manual

Battery power unit

Advertisement

BATTERY POWER UNIT
MODEL No 60166
OPERATOR'S HANDBOOK (PART No 34221)
ISSUE 4
NORBAR TORQUE TOOLS LTD, Beaumont Road, Banbury, Oxfordshire, OX16 7XJ, United Kingdom
Tel : + 44 (0) 1295 270333,
Fax : + 44 (0) 1295 753643

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 60166 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for norbar 60166

  • Page 1 BATTERY POWER UNIT MODEL No 60166 OPERATOR’S HANDBOOK (PART No 34221) ISSUE 4 NORBAR TORQUE TOOLS LTD, Beaumont Road, Banbury, Oxfordshire, OX16 7XJ, United Kingdom Tel : + 44 (0) 1295 270333, Fax : + 44 (0) 1295 753643...
  • Page 2 BATTERY POWER UNIT OPERATORS HANDBOOK PAGE 1 OF 6 ISSUE 4.0 OCT 1997 CONTENTS PAGE Introduction Mains Plug Fitting Specifications Operating Instructions Recharging Instructions Trouble Shooting...
  • Page 3 BATTERY DISCHARGED, SWITCH OFF OR RECHARGE The Norbar Battery Power Unit (BPU) is a ruggedly built, dual voltage re-chargable unit containing nickel cadmium cells that conforms to current EC Directives and Safety standards. The BPU can power up to two Norbar display instruments, Electronic Transducer System (ETS), Dedicated Transducer System (DTS) or Torque Wrench Analyser (TWA), or one instrument and one Norbar DATA PRINTER, allowing portability of the whole measurement system.
  • Page 4: Specifications

    BATTERY POWER UNIT OPERATORS HANDBOOK PAGE 3 OF 6 ISSUE 4.0 OCT 1997 SPECIFICATIONS BATTERY ROWER UNIT SPECIFICATIONS :- __________________________________________ OPERATION TIME AFTER FULL CHARGE Minimum of 8 hours with a load of 1 display instrument and 1 data printer. RECHARGE TIME 16 Hours from fully discharged.
  • Page 5: Operating Instructions

    VOLTS 110-120v OR 220-240v ac 50-60 Hz MADE I N ENGLAND BY NORBAR TORQUE TOOLS 1. Ensure the Battery Power Unit (BPU) front panel ‘FUNCTION SWITCH’ is in the ‘OFF’ position. 2. Fit the BPU connecting cable(s) to the back panels of the BPU and the instrument(s) being used.
  • Page 6 BATTERY POWER UNIT OPERATORS HANDBOOK PAGE 5 OF 6 ISSUE 4.0 OCT 1997 RECHARGE INSTRUCTIONS 1. Switch the front panel ‘FUNCTION SWITCH’ to the ‘CHARGE’ position. 2. Ensure mains voltage selector at the rear of the BPU is correctly positioned for your mains supply.
  • Page 7: Trouble Shooting

    Unplug the batteries from the battery pack p.c.b. before attempting to remove the fuses (2 A anti-surge), and reconnect once the fuses have been replaced. If problems are still incurred, return to Norbar or a Norbar appointed agent, for evaluation.

Table of Contents