Download Print this page

Zelart SUB1101U Assembly Instructions

Advertisement

Quick Links

BACK TRAINER
SUB1101U
ASSEMBLY INSTRUCTIONS

Advertisement

loading

Summary of Contents for Zelart SUB1101U

  • Page 1 BACK TRAINER SUB1101U ASSEMBLY INSTRUCTIONS...
  • Page 2: Exploded Drawing

    EXPLODED DRAWING...
  • Page 3: Parts List

    PARTS LIST NUMBER DESCRIPTION QUANTITY MAIN SUPPORT FRONT SUPPORT CUSHION POST FOAM ROLL POST LEFT HANDRAIL RIGHT HANDRAIL FOAM TUBE BOTTOM STABILIZER REINFORCEMENT PLATE CUSHION FOAM ROLLER FAST PIN SECURING KNOB SCREW M8*16 + WASHER SCREW M8*20 + WASHER SCREW M10*65 + TWO WASHERS + LOCK NUT SCREW M10*70 + TWO WASHERS + LOCK NUT SCREW M10*75 + TWO WASHERS + LOCK NUT ASSEMBLY INSTRUCTIONS...
  • Page 4 4. Attach foam roll post (4) to main support (1) with reinforcement plate (9) and screws M10*70 + washers + lock nuts (18). Note: There are two sets of holes in the main support (1) which allows you to attach the foam roll post (4) to two different positions.
  • Page 5 CUSHION HEIGHT ADJUSTMENT To adjust the height of the cushion (10), loosen but do not remove the securing knob (13). Loosen and pull the fast pin (12), slide the cushion (10) to the desired position, and secure with the fast pin (12). Tighten the fast pin (12) and securing knob (13).