Page 1
FS 240 SE Operating instructions Floor saw FS 240 SE Art.-Nr. der Bedienungsanleitung: 02822410998 ZN der Bedienungsanleitung: 5006580-00 Erstellt am: 04 / 2012 Erstellt von: Julia Großart Datei: K:\KDV\5006xxx\5006580-Bedienungsanleitung\ 5006580-00-Bedienungsanleitung-doc.doc GÖLZ GmbH Dommersbach 51 53940 Hellenthal-Blumenthal Telefon: (02482) 120 Telefax: (02482) 12135...
Page 2
FS 240 SE Operating instructions EG-KONFORMITÄTSERKLÄRUNG EC-DECLARATION OF CONFORMITY DECLARATION DE CONFORMITE DE LA CE Die Firma Manufacturer La Société GÖLZ GmbH Dommersbach 51, 53940 Hellenthal - Blumenthal Tel.: (02482) 120 Fax: (02482) 12135 Erklärt in alleiniger Verantwortung, dass Hereby certifies on it’s sole responsibility Déclare sous sa seule responsabilité...
FS 240 SE Operating instructions Contents Preface .......................... 4 General safety references....................4 2.1 Basic operation and designated use of the machine .............. 5 Organizational measures ....................5 Selection and qualification of person ................6 Normal operation of the machine ..................6 Special work related to the maintenance and repair of the machine ......
FS 240 SE Operating instructions Preface Thanks for choosing a GÖLZ-product. This operating instruction is designed to familiarize the user with the machine and its designated use. The operating instruction contains important information on how to operate the machine safely, pro- perly and most efficiently.
FS 240 SE Operating instructions 2.1 Basic operation and designated use of the machine The machine has been built in accordance with state-of-the-art standards and the recognized safety rules. Nevertheless, its use may constitute a risk to life and limb of the user or of third parties, or cause damage to the machine and to other material property.
FS 240 SE Operating instructions In case event of safety-relevant modifications or changes in the behaviour of the product, stop the product immediately and report the malfunction to the competent authority/ person. Do not remove or make inoperative any safety devices the product is equipped with.
FS 240 SE Operating instructions Noise protection equipment on the machine has to be in protective position during operation. Wear the prescribed personal ear protection! Avoid any operation that might be a risk to machine stability. Always keep at a distance from the edges of building pits and slopes.
FS 240 SE Operating instructions Information about special risks electrical energy Observe the relevant national regulations or standards. Electrical connections must always be kept free from dirt and moisture. Use only original fuses with the specified rating! Switch off the machine immediately, if trouble occurs in the electric power supply! When working with the machine, maintain a safe distance from overhead electric lines.
FS 240 SE Operating instructions Properly collect, store and dispose of operating materials and lubricants which can no longer be used! Observe and follow the respective applicable laws and regulations for handling operating materials and lubricants and their disposal in the country in which these substances are used! Obtain...
FS 240 SE Operating instructions Description Operate the machine only using tools in accordance with the manufacturer’s instruction. Using other tools is considered contrary to its designated use. The manufacturer cannot be held liable for any damage resulting from such use. The risk of such misuse lies entirely with the user.
FS 240 SE Operating instructions Transport Danger of down coming parts! Injury hazard: Sharp edges! Transport Before transport the emergency stop switch is to be pressed and the brake is to be actuated. Dismount the blade and attach again the blade guard.
FS 240 SE Operating instructions 5 / 6 The motor (Pos. 10) can now be removed sideways from the axes over the pushing rods together with the motor bracket and be carried by two people. For mounting, proceed in reverse order. After mounting, ensure the correct V-belt tension! Storing Store the machine in a dry, high or locked place, out of the reach of children or unauthorized persons.
FS 240 SE Operating instructions Installation Information: Unconditional observe the owner’s manual of the engine manufacturer! Danger: Never touch rotating parts like blade shaft or blade while operating! Danger: Rotating parts may pull in clothing! Wear tightly clothing! Danger: Down coming parts can cause injuries to the operator!! Place the machine on an even, firm and stable ground.
FS 240 SE Operating instructions Mounting the blade In the cutting speed range all used blades must be designed for the max. rpm of the machine. Never use faulty or damaged blades. Danger: Damaged cutting discs can cause serious personal injury!
FS 240 SE Operating instructions After mounting, fit the cutting disc guard again and fit the spring cotter pin again to its mounting hole. Make sure that the guard plate cutting shaft (Pos. 7) is in position. Water supply Screw the connecting piece (Pos. 1 SW26) of the water hose of the cutting disc guard to the double nipple (Pos.
FS 240 SE Operating instructions Adjusting and operating elements CEE-plug star-delta connection switch Emergency stop switch Main emergency stop switch Connection motor cable Electric power supply Ensure power-supply matches with details from motor rating-plate: Input voltage: V / 50 Hz, •...
Page 18
FS 240 SE Operating instructions In order to ensure trouble-free motor start, raise the machine, before you start it, by means of the hand crank (Pos. 4) to such extent that the cutting disc has no soil contact. Then turn the main emergency stop switch (Pos. 1) from "Off" to "On". To start the motor, turn the star- delta connection switch (Pos..
FS 240 SE Operating instructions Maintenance General Information: Clean the machine after every operation. Observe local environmental regulations! For your security and for a trouble-free operation of the machine, professional care and maintenance is indispensable. Maintenance and repair work is, as far as possible, generally to be carried out when the machine is shut down and the power plug pulled off.
FS 240 SE Operating instructions To make it easier to change the multiple V-belt, raise the machine slightly by means of the hand crank. Before you continue to work, press the emergency stop switch and pull off the power plug.
FS 240 SE Operating instructions Troubleshooting Attention: In the event of changes in the behaviour of the machine during operation, stop the machine immediately and report the malfunction to the competent authority / person! Problem Cause Remedy Engine Power plug is not properly...
FS 240 SE Operating instructions Wearing parts Wearing parts for construction devices mentioned in the operating manual such as drilling and sawing machines Wearing parts are the parts subject to operation-related (natural) wear during proper use of the device. The wearing time cannot be uniformly defined, and differs according to the intensity of use. The wearing parts must be adjusted, maintained and, if necessary, replaced for the specific device in accordance with the manufacturer’s operating manual.
FS 240 SE Operating instructions Spare parts list So bekommen Sie schnell und richtig Ihr Ersatzteil - für Maschine - Modell - Masch.-Nr. - Artikelnummer - Bezeichnung des Ersatzteiles - Anzahl der gewünschten Ersatzteile - Wohin liefern? - Womit liefern (Post, Eilpost etc.)?
Page 26
FS 240 SE Operating instructions Pos. Artikelnummer Menge Norm Info Benennung Description Désignation 0282 241 0087 Bedienpult Control panel Pupitre de commande Ø 200 x 60 0282 241 0001 Wheel Roue x Ø 25 DIN EN 0298 900 0010 A 10,5...
Page 32
FS 240 SE Operating instructions Pos. Artikelnummer Menge Norm Info Benennung Description Désignation DIN EN 0295 000 0187 M 10 x 20 Schraube Screw ISO 4017 DIN EN 0286 570 0047 B 10,5 Scheibe Washer Rondelle ISO 7090 DIN EN...
Page 34
FS 240 SE Operating instructions Pos. Artikelnummer Menge Norm Info Benennung Description Désignation 0282 241 0072 UCPG208 Stehlager Pedestal bearing Chaise palier 0286 570 0025 DIN 127 A 12 Federring Spring washer Rondelle-ressort DIN EN 0286 570 0020 M 12 x 30 Schraube...
Page 36
FS 240 SE Operating instructions Pos. Artikelnummer Menge Norm Info Benennung Description Désignation DIN EN 0281 045 0027 Mutter Écrou ISO 7040 DIN EN 0286 570 0069 B 6,4 Scheibe Washer Rondelle ISO 7090 0282 250 0649 Ø 20 Befestigungsschelle...
Page 37
FS 240 SE Operating instructions Pos. Artikelnummer Menge Norm Info Benennung Description Désignation Double nipple, Double raccord fileté, 0284 000 0352 1/2” I/A Doppelnippel, lösbar removeable soluble DIN EN 0282 301 0136 B 23 Scheibe Washer Rondelle ISO 7090 Robinet à tournant 0282 120 0040 R 1/2“...
Page 38
FS 240 SE Operating instructions Pos. Artikelnummer Menge Norm Info Benennung Description Désignation 0282 241 0090 Schubstange Connecting rod Jambe de force 0285 300 0044 Kunststoffgriff Handle Poignée 0282 241 0095 M 10 x 16 Klemmhebel Clamp lever Levier de serrage...
Page 39
FS 240 SE Operating instructions Pos. Artikelnummer Menge Norm Info Benennung Description Désignation 0282 190 0224 DIN 6336 M 8 x 20 Sterngriffschraube Star grip screw Vis de poignée-étoile 0282 241 0097 Kabelhalter Cable support Cadre support du câble 0282 241 0096...
Page 40
FS 240 SE Operating instructions Pos. Artikelnummer Menge Norm Info Benennung Description Désignation Carter de protection du 0282 241 0045 Flanschschutzhaube Flange cover flasque 0282 301 0183 DIN 11024 Ø 4 Federstecker Spring connector Goupille a ressort 0282 241 0034 DIN 7337 Ø...
Page 46
FS 240 SE Operating instructions Pos. Artikelnummer Menge Norm Info Benennung Description Désignation 0282 650 0147 Haupt-Not-Ausschalter Main switch Commutateur principal 0282 252 0164 180 mm Hutschiene Cap rail Profilé-support 0282 252 0164 165 mm Hutschiene Cap rail Profilé-support DIN EN...
Need help?
Do you have a question about the FS 240 SE and is the answer not in the manual?
Questions and answers