Advertisement

INSTALLATION GUIDE FOR YOUR
AKURUM KITCHEN

Advertisement

Table of Contents
loading

Summary of Contents for IKEA Akurum kitchen

  • Page 1 INSTALLATION GUIDE FOR YOUR AKURUM KITCHEN...
  • Page 2 We have also creat- ed a Kitchen Installation video, available at any IKEA store location, to give you an overview of the installation process. © Inter IKEA Systems B.V. 2004...
  • Page 3 Mitre box with saw FIXA 35 mm hole cutter - to drill extra holes for - to ensure that you cut the cornices at exactly the tap in the sink the right angle (if necessary) © Inter IKEA Systems B.V. 2004...
  • Page 4 The second coat you may want to hire a professional. of paint and any wallpapering should be com- pleted after the cabinets are installed. © Inter IKEA Systems B.V. 2004...
  • Page 5 If you purchased a solid wood countertop from will be installing them so that you can quickly IKEA, be sure to store it in or near the kitchen. find the right cabinet when you need it. This allows it to adjust to room temperature.
  • Page 6 Always start with a corner cabinet and work your way out. Hang the Once you’ve completed all the steps on the poster on poster, you’re ready to install base and high the wall cabinets. for Step 3 © Inter IKEA Systems B.V. 2004...
  • Page 7 • Installing a corner lazy-susan IMPORTANT! Before putting in any of these cabinets, be sure to measure, mark and cut openings for plumbing, Hang the power sources and other utilities. poster on the wall for Step 4 © Inter IKEA Systems B.V. 2004...
  • Page 8 The Step 5 poster details the installation, care tertops and sink. In addition to the solid wood and maintenance of these durable solid wood countertops detailed in this step, IKEA also countertops. offers a wide range in laminate countertops. • Measuring countertop lengths •...
  • Page 9 The Step 6 poster provides instructions for: • Installing cover panels • Installing lighting • Fitting shelves • Attaching knobs and handles • Installing drawers Hang the poster on the wall for Step 6 © Inter IKEA Systems B.V. 2004...
  • Page 10 • Attaching plinths and mouldings • Attaching light decor strips • Installing cornices • Hanging doors • Attaching knobs and handles • Attaching plastic buffers Hang the poster on the wall for Step 7 © Inter IKEA Systems B.V. 2004...
  • Page 11 Best oughly and wiped dry. Be sure to clean in the of all, you got more for your money at IKEA direction of the metal’s grain. Never use steel because you did a lot of the work yourself. With...
  • Page 12 Mark its position. While subsequent lems need to be fixed, you may want mark the high and low points on the ”, call your IKEA expert for assis- or 92 ” for 39” wall cabinets. Next, studs are usually at 16” intervals, they to hire a professional.
  • Page 13 Step 4. Install the base and high cabinets Hang these instructions on the wall so you’ll have your hands free Next, it’s time for the base and high cabinets. Before you begin, note all plumb- ing, power sources and other utilities. Measure these locations carefully, and, using a hole saw, cut the appropriate openings before each cabinet is installed.
  • Page 14 If your sink is not pre-drilled for the Sand and oil your counterop regularly faucet or other fittings, you´ll need to Your solid wood countertop from IKEA for long-term beauty and protection. cut the necessary holes in the sink. was pretreated at the factory to condi-...
  • Page 15 When you’ve completed Step 6, all interior cabinet accessories will be in place. When you’ve completed Step 7, your new IKEA kitchen is ready to use! The cabinets have predrilled holes for quick and It’s almost time to celebrate—you only have a few more easy installation of shelving, drawers and things left to do! But they’re important, so be sure to take...
  • Page 16 Congratulations on your new IKEA Kitchen, and on the money you saved! © Inter IKEA Systems B.V. 2004...

Table of Contents