Download Print this page

Makita UC3003A Technical Information page 8

Advertisement

W
iring diagram- (2) Inside Handle (L)
1. Before installing Main switch onto Handle (L), fix the following lead wires
with lead wire holders as illustrated in Fig. 19.
* Field lead wire (orange)
* Field lead wire (yellow)
* Lead wire (black) from switch installed on Gear housing (L)
Fig. 19
Noise suppressor
2. After installation of Main switch, put the loose portion of the Lead wires into the space illustrated in Fig. 20.
Fig. 20
Main switch
Handle (L)
Noise suppressor
Handle (L)
Lead wire holders
Main switch
Put the loose portion of
lead wires into this pace.
P 8 / 8
Lead wire (black) from
Switch installed on
Gear housing (L)
Field lead
wire (orange)
Field lead
wire (yellow)
[end of repair manual]

Advertisement

loading

This manual is also suitable for:

Uc4003aUc3503aUc4503a