Name Function
V1 First stage for both channels.
V2 Second stage for both channels.
V3 Third and fourth stage for the D-channel.
V4 FX Loop.
V5 Phase inverter.
V6 End stage tube.
V7 End stage tube.
1.
Make sure that the device is turned off, disconnected from the mains and completely
cooled down. The minimum wait time after disconnecting the voltage supply is ten
minutes.
2.
Remove the metal caps and remove the old tubes with a gentle, even pulling motion,
gently rocking the tubes back and forth, out of the bases.
3.
Push the pins of the new tubes with gentle, even pressure and slight back and forth
movements into the base and place the metal caps on the tubes.
Echolette MK I
Maintenance
27