Remove the five screws on the lower section.
Remove the grinding regulation knob as shown.
Now the entire RH section can be removed and
access obtained to the unit and the micro
switches of the side doors and dredge
unloading.
The photo shows the two micro switches of the
door and dredge unloading.
The micro with three attached wires also sends
a signal to the board for dredge count reset.
8