Charging the Battery
Service Interval: Before storage—Charge the battery and
disconnect the battery cables.
1. Remove the battery from the chassis; refer to
the Battery (page
35).
2. Charge the battery for a minimum of 1 hour at 6 to
10 A.
Note: Do not overcharge the battery.
3. When the battery is fully charged, unplug the charger
from the electrical outlet, then disconnect the charger
leads from the battery posts
Figure 39
1. Positive (+) battery post
2. Negative (–) battery post
Installing the Battery
1. Position the battery in the tray
2. Using the fasteners previously removed, install the
positive (red) battery cable to the positive (+) battery
terminal.
3. Using the fasteners previously removed, install the
negative battery cable to the negative (-) battery
terminal.
4. Slide the red terminal boot onto the positive (red)
battery post.
5. Secure the battery with the hold-down
6. Lower the seat.
Removing
(Figure
39).
3. Red (+) charger lead
4. Black (–) charger lead
(Figure
38).
(Figure
38).
Servicing the Fuses
The electrical system is protected by fuses. It requires no
maintenance; however, if a fuse blows, check the component
or circuit for a malfunction or short.
Fuse type:
•
Main—F1-30 A, blade-type
•
Charge Circuit—F2-25 A, blade-type
1. Remove the screws securing the control panel to the
machine.
Note: Retain all fasteners.
2. Lift the control panel up to access the main wire
harness and fuse block
3. To replace a fuse, pull out the fuse to remove it
40).
2
1. Main—30 A
4. Return the control panel to its original position.
Note: Use the screws removed previously to secure
the panel to the machine.
36
(Figure
40).
1
G014921
Figure 40
2. Charge circuit—25 A
(Figure