Do you have a question about the Holzgas and is the answer not in the manual?
Questions and answers
Summary of Contents for Sigma Holzgas
Page 1
Manual and Installation book of boiler Sigma Holzgas 18-60kW CHT Heizkessel GmbH Gartenfelder Strasse 29-37, 13599 Berlin Tel.:+ 49 30 – 30 64 17 29 Fax: + 49 30 – 30 64 17 27 info@cht-heizkessel.de service@cht-heizkessel.de Ü Ü...
Page 2
Manual and Installation book of boiler Table of contents 1) Short description - 3 - 2) Technical data - 4 - 3) Fuel - 8 - 4) Using and Service - 8 - 5) Control -11- 6) System -14- 7) Parts -17- 8) Boiler installation systems -19-...
Page 3
1.1) Gasification technology The wood gas (ger. holzgas) comes in the process of gasifing of the wood. This is the mixture of flammable gases: the oxide of carbon, hydrogen and methane, and also incombustible -- nitrogen, the dioxide of carbon, water steam. The composition of the gas depends on many factors as: from current temperature in the hearth of the gas generator, the moisture of the loaded fuel and other.
The boilers of type Westfalia Holzgas are designed to heating up water in c. h. installations which computational temperature of supply do not cross 85 °C.
Recommended Chimney's Intersection Inlet/Outlet Diameter “ Bottom Outlet Diameter “ Weight: Power Consumption 2.1) Outtake Fan WC170 2.1.1) Technical data Power supply -230V, 50Hz Temp. of surroundings 0=40°C Power consumption Temp. of fumes do 350°C Expense of air UM /11 Loudness 65dB Number of gears...
Page 6
The body of boiler is made from certified steels and welded in cover of argon. Westfalia Holzgas is equipped in ceramic burner nozzle and ceramic deflectors. 2.3) Special features of Sigma Holzgas: •...
Page 8
Fuel Wood with humidity up to 25% Chunks dimensions 30-50cm The wood has to be dry! The efficiency of the boiler falls together with growing moisture of the wood, settling tartly substances increases and the life of the boiler drops. Power and proper functioning of the boiler are guaranteed near maximum moisture the wood to 20%.
4.3) Setting air inlets Upper shutter is responsible for main air inlet. Lower shutter is responsible for secondary air inlet. The position of the shutter of Burning time Shutter position Power regulating opening in the (in hours) front plate of the casing Max.
Page 10
4.4.1) Clearing the deflectors and burner nozzle… • Remove the ash and any cinders from the unit. • Remove any wood left in the unit. • Remove the tight rope. • Take out the ceramic nozzle. • Remove the ceramic deflectors from the lower chamber. •...
Page 11
Pay particular attention to ash in the exhaust deflector and the flue pipe. The flue pipe does NOT clean itself. You must do this yourself. An old vacuum cleaner is the best method. 4.4.3) Clearing the exchanger… • Upper cleanout •...
Page 12
Controller RK 2001W 5.1) Schematic diagram of work: ventilator "H" speed maximum speed of ventilator "d" "d" speed near blowthroughs "E" work work "P" work "P" work ventilator pause pause pause "c" "c" "c" T>Ts T<Ts T<31oC Phaze of emblazing Automatic work Blanking Ts -set temperature...
Page 13
controller. The temperature sensor should be placed in a measurement hole in the boiler. CAUTION! Before plugging in the controller check if the wiring system is properly grounded and if the terminal screws of the output connector are properly screwed. CAUTION! A fan and a central heating pump of maximum power of 450W can be connected to the controller.
Page 14
for a short time. After pressing START button the fan starts to work and the control process begins. STOP button stops the fan for example to add fuel. If the controller is not in user or service mode the display shows water temperature in the boiler and the last character on the display defines the mode which the controller is currently in: for example:...
Page 15
Central heating pump work [co C] – WINTER/SUMMER mode – character “C” indicates that the central heating pump is working. In summer time the heating can be turned off by choosing the value “-“ with the (-) button which means turning off the central heating pump. Total bacteria control in the hot water tank –...
Page 16
Ph 2 Central heating pup launch hysteresis 1˚C Pause time of central heating pump with Pc 2 --,1 1min 30 sec. work periods u 50 Tap hot water desired temperature 1˚C uh 5 hot water heating hysteresis 1˚C No hot water-0, hot water priority-1, no ur 0 hot water priority-2, mixing pump-3 L 40...
Page 17
Fan work time [Πr 1] - time of turning the fan on for a while, to remove accumulated gases. Setting the parameter to "--" turns this function off. This function can be active in WORK mode. Fan pause time [Nu 6] - time between fan work periods Central heating pump work parameters Central heating pump launch temperature [P 40] –...
Page 18
Boiler overheating temperature [A 99] - value, exceeding which causes permanent turn off of the fan to prevent boiler overheating. After the temperature increases above 80˚C the central heating pump is turned on to cool down the boiler. Overheating mode is shown by indicating error [E 2] on the display.
Factory defaults The controller allows returning to standard settings set by the producer by choosing [Prod] and pressing OK button. After activating this function, the controller sets each parameter showed in the table. Output testing To make checking the controller work easier, it is possible to test output circuits which control the fan and the pump, and the additional boiler launching system.
Page 20
When [E 1] error appears on the display, it means fault in the boiler sensor circuit or temperature below 0°C. [E 2] is displayed if boiler overheats. [E 3] error means fault and overheating at the same time. Appearing of [E 1] error on the display after erasing it by pressing STOP button, in spite of temperature decreasing below 90°C, may mean permanent damage of boiler temperature sensor (e.g.
Picture. 3 UM-1 module connection diagram 6.2.8) Controller removal In case the removal is necessary proceed as follows: - turn the master switch off - disconnect the power of the boiler - remove the controller from the slot in the boiler - disconnect all connectors with leads from the controller 6.2.9) Specifications...
Page 22
No hot water-0, hot water priority-1, no hot water priority-2, ur 0 mixing pump-3 L 40 Minimum boiler temperature H 90 Maximum boiler temperature Boiler temperature hysteresis A 99 Boiler overheating temperature Fd60 Fuel shortage testing time with burning, increase by 5˚C Fuel shortage testing time in WORK mode and burning Fb30 out.
Page 23
7.3) Ventilation: Accordantly with regulations each boiler room has to have the ventilation inlet and outlet in aim of assurance of correct boilers work and users safety. Lack of ventilation inlet or it’s stocking is the most frequent cause of incorrect work of boiler (the humidity, condense water, impossibility...
• Spout should be under ceiling of room, led out on roof at least 1,5 m • Ventilation duct should be made from incombustible material 7.4) Chimney connection: • Flues should be made in accordance with current regulations. • To reduce the resistances of flow of flue gases the connection with chimney should be led in straight line and possible change of direction should be made with gentle arcs.
Page 26
Part Description Serial Number Left Side Casing F.h.b.l.01 Front Casing F.h.p.02 Top Casing (Hat) F.h.g.03 Door Casing Upper F.h.d.g.04 Door Casing Lower F.h.d.d.05 Steering Panel F.h.p.s.06 Right Side Casing F.h.b.p.07 010. Thermometer F.h.t.010 011. Thermostat F.h.t.011 012. Power Switch WA-12PS F.h.ł.012 013.
Boiler installation systems: Open system The bottom of the safety tank must be placed: • In natural circulation systems or with pump on heating water H ≥ 0.3 [m] over the highest point of the system. • In systems with pump installed on return water: H ≤ 0.7Hp [m] - 27 -...
Closed systems Warning! – To collect boiler in closed system it is important to build in the boiler cooling loop and then make a right connection: - 29 -...
Need help?
Do you have a question about the Holzgas and is the answer not in the manual?
Questions and answers