7. Disassembly and Assembly Instructions
7-1. Assembly
1
Land SUB PBA on the UPPER.
1. Land PBA after PBA is inserted in UPPER SUS hall. 1. Push down not to get loose.
3
Assemble LOWER
1. Insert FPCB into the LOWER hole
2. Land LOWER after LOWER is inserted into the hole
of the lower end.
SAMSUNG Proprietary-Contents may change without notice
This Document can not be used without Samsung's authorization
Land receiver and camera on the UPPER.
2
4
Screw LOWER
1. screw : 1.1 kgf.cm
7-1