Inverter Operation - Energizer EN100 Owner's Manual

Table of Contents

Advertisement

6 Inverter Operation

1 .
When properly connected to a 12V outlet, the
light will glow GREEN, indicating the inverter is
ready.
2.
Plug the product(s) you want to operate into the
AC outlet or USB port and switch them on (if
necessary).
Operating Guidelines
As the battery is used, its voltage begins to fall.
When the EN100 senses that the voltage at its
DC input has dropped to 10.5V, the inverter
automatically shuts down and the light glows RED,
indicating a fault. This prevents the battery from
being damaged. Turn off any devices that the
EN100 is powering.
9

Advertisement

Table of Contents
loading

Table of Contents