DCG LEAD WIRE DRESSING (ALL EXCEPT KD-34XBR960)
STEP1:
Make a loop in leads
and route loop BEHIND
The DGC Coil.
STEP 2:
Thread both connector
housings through the
loop in lead wires.
STEP 3:
Plug in connector
housings into the
[AZ] Board using the
loop to take up slack.
KD-30XS955/34XBR960/34XS955/36XS955
Cable Tie
4-041-041-02
DY
KD-30XS955/34XBR960/34XS955/36XS955
Rev. 1
5/10/04
29