Abt FRONT CONTROL 30" Installation Instructions Manual page 5

Table of Contents

Advertisement

Available languages

Available languages

30" GAS RANGE INSTALLATION INSTRUCTIONS
B. Drill Pilot Holes and Fasten Bracket - Drill
a
1/8" pilot hole where screws are to be located. If
bracket is to be mounted to the wall, drill pilot hole at
an approximate 20° downward angle. If bracket is to be
mounted to masonry or ceramic floors, drill a 3/16" pilot
hole 1-3/4" deep. The screws provided may be used in
wood or concrete material. Use a 5/16" nut-driver or flat
head screwdriver to secure the bracket in place.
Figure 2
C. Level and position the range -
its final position. Insert the range leveling leg in the anti-tip
bracket. Visually verify if the anti-tip bracket is engaged.
Lower the range by adjusting the 4 leveling legs alternatively
until the range is level. Check if the range is level by placing
a spirit level on the oven rack. Take 2 readings with the spirit
level placed diagonally; take a reading in one direction and
then in the other direction. Level the range if necessary by
adjusting the leveling legs.
Range
side
Figure 3
Figure 4
Leveler
5
Slide range to
Leg
Raise
Lower
Figure 5

Advertisement

Table of Contents
loading

Table of Contents