Download Print this page

Makita BO4900V Technical Information page 8

Hide thumbs Also See for BO4900V:

Advertisement

R
epair
< 5 > Assembling ball bearings 6002LLB
1. Holding the ball bearings 6002LLB with No.1R232 "Pipe 30", insert sleeve into ball bearings by pressing it
with arbor press as illustrated in Fig. 11.
2. Assemble the ball bearings 6002LLB (with sleeve) to base by pressing with arbor press as illustrated in Fig. 12.
3. Assemble thin washer 15 and bearing retainer 24 by fastening them with 3 pcs. of tapping screws CT 4x12 as
illustrated in Fig. 13.
Press with arbor press.
No.1R244
Round bar
for arbor
Sleeve
No.1R232
"Pipe 30
Fig. 11
< 6 > Disassembling armature
1. Disassemble top cover by unscrewing 5 pcs. of tapping screws 4x18. And disassemble carbon brushes as illustrated
in Fig. 14.
2. Separate motor housing from frame after unscrewing 4 pcs. of tapping screws bind CT 4x20 as illustrated in Fig. 15.
3. Slightly hit the armature shaft with plastic hammer as illustrated in Fig. 16. Then armature can be separated
from frame.
Top cover
Fig. 14
Ball bearing 608DDW can be
disassembled with No.1R269
" Bearing Extractor small type."
< 7 > Assembling armature
Take the reverse steps of Fig.13 - Fig.15.
Press with arbor press.
No.1R248
Round bar
for arbor
Ball bearings
6002LLB
5 pcs. of
tapping screws 4x18.
Carbon brushes
3 pcs. of
tapping screws CT 4x12
Bearing retainer 24
Thin washer 15
Fig. 12
4 pcs. of tapping
screws bind CT 4x20
Fig.15
Frame
Fig. 16
P 8 / 14
Fig. 13
Motor housing
Armature
Frame
Armature shaft

Advertisement

loading

This manual is also suitable for:

Bo4901Bo4900