Hualian Machinery DZ 260-PD Series Operation Manual

Hualian Machinery DZ 260-PD Series Operation Manual

Advertisement

Quick Links

Operation manual
Table-style vacuum packing machine
Contents
1: Use & Feature
2: Model & Specification
3: Control Panel and Settings
4: Prepare bevor using
5: Operation Procedure
6: Other Cautions
7: Circuit Diagram
8: Vacuum Lid Breakdown
9: Vacuum Chamber Breakdown
10: Base Plate Breakdown
Ensure that the machine is properly
grounded before operation.
rt.-No. 30939
8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DZ 260-PD Series and is the answer not in the manual?

Questions and answers

Kenny Zerangue
March 24, 2025

Good morning, where can i get parts for this machine?

1 comments:
Mr. Anderson
May 14, 2025

You can find parts for the Hualian Machinery DZ 260-PD Series in the breakdown sections of the manual, specifically:

- Section 8: Vacuum Lid Breakdown
- Section 9: Vacuum Chamber Breakdown
- Section 10: Base Plate Breakdown

These sections list components such as the solenoid valve, control transformer, filter, vacuum pump filter, AC contactor, and others by name and part number.

This answer is automatically generated

Subscribe to Our Youtube Channel

Summary of Contents for Hualian Machinery DZ 260-PD Series

  • Page 1 Operation manual Table-style vacuum packing machine rt.-No. 30939 Contents 1: Use & Feature 2: Model & Specification 3: Control Panel and Settings 4: Prepare bevor using 5: Operation Procedure 6: Other Cautions 7: Circuit Diagram 8: Vacuum Lid Breakdown 9: Vacuum Chamber Breakdown 10: Base Plate Breakdown Ensure that the machine is properly grounded before operation.
  • Page 2 1. Use und Feature 1,1 Use DZ 260-PD series vacuum packaging machine possesses the advantages of su- perior function, easy operation, simple maintenance, wide application etc. It ap- plies to the soft packing material such as composite film or aluminium-plastic composite film and so on.
  • Page 3 3. Operator and Programming Figure 1 Adjust/Set Timing Controls 3,1,1 Turn power switch (air switch) ”ON”, ”00” shows on instrument board, wich mesns the machine is in the state of stand.by. 3,1,2 Press the ”SET” button once and you will notice the ”Vacuum” indicator will light.
  • Page 4 5. Operation Procedure Connect to power supply. (Close air switch). Adjust the parameters of every function, including vaccum, sealing and cooling. Meanwhile, select suitable sealing voltage. Select sealing voltage and regulate sealing time. There are three grades of voltage optional, namely, high, middle and low. The sealing time should be adjusted from low to high gradually.
  • Page 5: Circuit Diagram

    7 Circuit diagram 8 Vacuum Lid Breakdown 8.1 = Vacuum lid 8.2 = M6 cylinder-heat inner-hexagon screw 8.3 = Upper press plate for vacuum lid 8.4 = Down press plate for vacuum lid 8.5 = Sealing rubber 8.6 = Double-sided adhesive foamed tape 8.7 = Silicon strip seat 8.8 = Silicone strip...
  • Page 6 9 Breakdown Drawing of 10 Breakdown Drawing of Vacuum Chamber Hull & Bottom-plate 9.1 = Vacuum chamber assembly 9.2 = Epoxy plate assembly 9.3 = Air chamber sealing ring 9.4 = Air chamber assembly 10.1 = Hull 10.2 = M6 cylinder head inner-hexagon screw 9.5 = Tension spring adjusting pole 10.3 = Vacuum lid hook...

Table of Contents