vienybe SIRIJUS 20 Technical Datasheet, Installation And Operation Manual

Solid fuel boilers

Advertisement

ENG
Technical Datasheet, installation and Operation Manual
3
SOLID FUEL BOILERS
SIRIJUS 20
SIRIJUS 30
LST EN 303-5
GOST 20548

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SIRIJUS 20 and is the answer not in the manual?

Questions and answers

Summary of Contents for vienybe SIRIJUS 20

  • Page 1 Technical Datasheet, installation and Operation Manual SOLID FUEL BOILERS SIRIJUS 20 SIRIJUS 30 LST EN 303-5 GOST 20548...
  • Page 2: Table Of Contents

    10. Scope of Supply ..............16 11. Warranty ................16 12. Warranty Claim Form ............17 13. Certificate of Acceptance .............18 ______________________________________________________ date of receipt (purchase) of the product, signature Sirijus 20, 30 (13.05) V1 LT Sirijus 20, 30 (13.05) V1 LT...
  • Page 3: General Information

    This will help You to properly install and the most effectively use the product purchased and to avoid accidents. When buying the boiler, please read terms of warranty, make sure that the certificate of acceptance is filled in completely and correctly. Sirijus 20, 30 (13.05) V1 LT Sirijus 20, 30 (13.05) V1 LT...
  • Page 4: Technical Data

    In case of emergency, please call on the above telephone numbers or send the warranty claim form by fax 8-340 63544 or by email info@SIRIJUS.lt, and submit the filled in and signed form and the purchase document to the arrived representatives of the company. Sirijus 20, 30 (13.05) V1 LT Sirijus 20, 30 (13.05) V1 LT...
  • Page 5: Description Of The Design

    Briquettes must be kept dry, otherwise they may fall apart. Firing of wet fuel reduces power output of the boiler and increases fuel consumption, the boiler gets pitched, corrosion of the chamber gets faster. Sirijus 20, 30 (13.05) V1 LT Sirijus 20, 30 (13.05) V1 LT...
  • Page 6: Transportation And Storage

    “Regulus” DBV1 (Czech Republic). Please install the valve in accordance with the at least 1m. It should be installed horizontally or sloped forward up to the angle of 1°. installation instructions. Sirijus 20, 30 (13.05) V1 LT Sirijus 20, 30 (13.05) V1 LT...
  • Page 7: Chimney And Flue

    A regularly used boiler should be cleaned 2-3 times a month. NOTICE! Do not clean the boiler during its heating. Sirijus 20, 30 (13.05) V1 LT Sirijus 20, 30 (13.05) V1 LT...
  • Page 8: Operation Of The Boiler

    Recommended scheme of boiler connection to the system with accumulation tank 1. Boiler. 2.Accumulation tank “Vienybe - AT...” 3.Water heater. 4. Expansion tank. 5.Recycling 6.3. HEATING pump. 6.Water strainer. 7.Shutter. 8.Reverse valve. 9.Thermostat. 10.Manometer 11.Bleed When the fuel gets fired, please close the inner door 9 and the bottom door 16.
  • Page 9 Excessive system pressure is removed through the valve tube “C”, so, that the tube must be connected to the drainage. Minimal diameter of connecting valve pipes is DN16. Sirijus 20, 30 (13.05) V1 LT Sirijus 20, 30 (13.05) V1 LT...

This manual is also suitable for:

Sirijus 30

Table of Contents