Sharp LC-26GA3E Service Manual page 14

Hide thumbs Also See for LC-26GA3E:
Table of Contents

Advertisement

LC-26GA3E
10. Remove the Main and CPU PWBs.
10-1. Remove the 8 lock screws 10 from the Main PWB shield, and detach the Main PWB shield.
10-2. Remove the 14 lock screws 11 from the Main Top Shield, and detach the Main Top Shield.
10-3. Remove the 3 lock screws 12 from the BS terminal cover, and detach the BS terminal cover.
11. Detach the DVI PWB.
11-1. Remove the 8 lock screws 13 from DVI PWB.
11-2. Remove the 4 lock screws 14 from the AV-Sub Angle, and detach the AV-Sub Angle.
12. Remove the 3 lock screws 15 from the DC fan, and detach the DC fan.
13. Disconnect all the connectors from all the PWBs.
11
11
11
11
P2002
SC4601
P7706
SC3200
SC3802
P1901
P3101
13
DVI PWB
14
13
14
AV-Sub Angle
Main Top Shield
P8506
SC7200
P7200
10
10
10
Main PWB Shield
P5703
CN708
CN706
CN7601
P7704
CN7602
CN7603
CN7604
P3811
CN7605
CN7606
CN7607
P3808
CN7608
P202
P101
14
P1804
P1803
P8502
CPU PWB
Main PWB
Card Cover
BS Terminal Cover
12
12
P7708
C707
P7705
P2003
P7707
SC4652
SC4651
P2004
CN7501
CN705
P3807
CN704
P3801
P6001
P3810
15
DC Fan
CN7502
CN7503
CN7504
CN7505
CN7506
CN7507
CN7508

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents