Munchkin HIGH EFFICIENCY HEATER with the "925" Controller Operating Instructions Manual page 32

High efficiency heater with the “925” controller
Table of Contents

Advertisement

Standard Munchkin boiler
Preferred piping
(multiple boilers / zoning with circulators)
Space heating mode
space heating zone circuit
make-up water
closely
spaced
tees
purging
valves
PB1
T/P
Munchkin boiler
NOTES:
This drawing is meant to show system piping concept only.
1.
Installer is responsible for all equipment & detailing required by local codes.
2.
All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3.
A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4.
The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5.
The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches.
All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.
6.
7.
The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119˚F.
8.
Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9.
A purging valve may be used in lieu of the ball valve / hose bib combination shown.
NOTE: FOR VISION PIPING APPLICATIONS, REFER TO THE VISION INSTALLATION PIPING DIAGRAMS.
Fig. 5-9
32
PB2
T/P
Munchkin boiler
Drawing 2E
zone
circulators
anti-scald
mixing valve
P2
Super Stor
indirect DHW tank
PIPING
cold
water

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Munchkin

Table of Contents