Advertisement

Installation and Instruction manual
FRESH WATER STATION
FWS 20 E
FWS 30 E
FWS 35 E
FWS WP E
Tank- and Wall fastening
E & OE, subject to change without notice.
InstallatIon and InstructIon manual FRESH watER Station
EN
1

Advertisement

Table of Contents
loading

Summary of Contents for Kioto Solar FWS 20 E

  • Page 1 InstallatIon and InstructIon manual FRESH watER Station Installation and Instruction manual FRESH WATER STATION FWS 20 E FWS 30 E FWS 35 E FWS WP E Tank- and Wall fastening E & OE, subject to change without notice.
  • Page 2: Table Of Contents

    Table of contents Usage Terms of warranty Safety instructions and symbol legend Safety instructions Symbol legend Scope of delivery Provisions Statutory provisions Manufacturer’s specifications Technical data Installation Installation on buffer tank Wall fastening Hydraulic installation Circulation unit (optional) Design of circulation unit Installation of circulation unit Electrical connection of circulation unit Operating modes of circulation unit...
  • Page 3: Usage

    InstallatIon and InstructIon manual FRESH watER Station Usage The Fresh Water Station is used to heat up tap water in connection with a buffer tank. It will be installed next to the buffer tank at the wall or directly onto the buffer tank at special system solutions. Another use or installation is not intended.
  • Page 4: Symbol Legend

    Symbol legend Safety instructions are marked with a warning triangle as illustrated on the left. Safety instructions indicate important information for potentially dangerous situations for person and device. Additional buzzwords describe nature and severity of the danger. Advices are marked with an information sign as illustrated on the left. Advices highlight important information for situations without severe danger for person and device.
  • Page 5: Provisions

    InstallatIon and InstructIon manual FRESH watER Station Mounting Set Statutory provisions The Device must be installed and operated according to the following norms and country specific directives and provisions: DIN EN 12828 DIN 1988 DIN 4708 DIN 4753 DIN 4757 DIN 18380 DIN 18381 DIN 18382 DIN EN 12975 VDE 0100 VDE 0185 VDE 0190 ÖNORM H5195 Material damage Deviations from the values stated in table 1 may lead to damages and functional limitations of the device.
  • Page 6: Technical Data

    Circulation unit (optional) Cold water Hot water From buffer tank (flow) To buffer tank (return) Circulation pipe (not included) Fresh water station FWS 20 E FWS 30 E FWS 35 E FWS WP E Output [l/min] Heat exchanger [plates] Weight [kg] Charge pump...
  • Page 7: Installation

    InstallatIon and InstructIon manual FRESH watER Station Installation Material damage Avoid tightening torque and force effects on already installed parts and connections of the device. Regulation The Fresh Water Station includes a self-sufficient regulation. An additional external regulation is not intended and not allowed. Installation on buffer tank ca. 10 ca. 40 max. 70 Nm max. 10 Nm Installation of Fresh Water Station Installation of water piping 45°...
  • Page 8: Wall Fastening

    max. 70 Nm Final assembly of shaped connection set Wall fastening (Drilling plan for wall fastening on page 14)   Schnitt A-A M1 : 3 min. max. 10 Nm max. 70 Nm E & OE, subject to change without notice.
  • Page 9: Hydraulic Installation

    InstallatIon and InstructIon manual FRESH watER Station Hydraulic installation Install the hydraulic piping according to the instructions in chapters "Installation on buffer tank" and "Wall fastening". Piping Piping between buffer tank and Fresh Water Station ought to be as short as possible. When using different piping materials take care of the installation sequence to avoid electrochemical corrosion Personal and material damage The tap water supply needs to be constructed according to specification (Picture below ).
  • Page 10: Installation Of Circulation Unit

    Installation of circulation unit Personal and material damage Sufficient expansion and overpressure safety devices must be installed in the circulation circuit A rinsing port needs to be installed in the circulation circuit. Electrical connection of circulation unit Danger to life Manipulation of electrical parts must be conducted by a professional electrician. Deenergize the device before opening it. Local regulations must be observed! Connect the circulation unit according to the desired operating mode.
  • Page 11: Operating Modes Of Circulation Unit

    InstallatIon and InstructIon manual FRESH watER Station Operating modes of circulation unit Circulation shutdown temperature The circulation will be deactivated when the shutdown temperature is reached. The preset temperature at the temperature dial (A) must be at least 10 K below the set temperature at the Fresh Water Station to avoid non-stop operation of the circulation unit Set the temperature dial to the desired temperature.
  • Page 12: Initiation

    Initiation Material damages Put fresh Water Station into operation only after completed filling. • Check tightness of swivel nuts.. • Fill device and check for leak-tightness. • Open valves on both buffer and tap water sides slowly to avoid pressure blows. • Connect device to power supply. • De-aeration and rinsing of device: • Open a nearby hot water tapping point and turn thermostatic head to maximum.
  • Page 13: No Hot Water

    InstallatIon and InstructIon manual FRESH watER Station No hot water Cause Relief Buffer tank not hot enough • Increase temperature in buffer tank Charge pump doesn’t • Check water level in buffer tank (extraction of buffer water for the convey buffer water Fresh Water Station happens at the highest point of the tank) • De-aerate buffer circuit and check system pressure • Check, if all shutoffs (buffer and tap water side) are open.
  • Page 14: Drilling Plan For Wall Fastening

    Drilling plan for wall fastening E & OE, subject to change without notice.
  • Page 15: Overview Connections Fws+Hkg+Sst Fresh Water Tank

    InstallatIon and InstructIon manual FRESH watER Station Overview connections FWS+HKG+SST fresh water tank Fresh water station Feed fresh water station hot Return fresh water station cold Heating circuit group Return heating circuit low temp. cold Feed heating circuit low temp. hot Return heating circuit high temp.
  • Page 16: Cascade Circuit

    Cascade Circuit 35 kPa 25 kPa Fresh Water Station – Station 1 Buffer water return Fresh Water Station – Station 2 Buffer water flow (1300 l/h per station) Fresh Water Station – Station 3 Tap water (hot) (max. 3 stations) Circulation return (optional) Circulation unit (optional) Tap water supply Overflow valve Thermostat settings...
  • Page 17: Notes

    InstallatIon and InstructIon manual FRESH watER Station Notes E & OE, subject to change without notice.
  • Page 18 Notes E & OE, subject to change without notice.
  • Page 19 InstallatIon and InstructIon manual FRESH watER Station Notes E & OE, subject to change without notice.
  • Page 20 Contact: E & OE, subject to change without notice.

This manual is also suitable for:

Fws 30 eFws wp eFws 35 e

Table of Contents