Carrier 50ZP036 Installation, Start-Up And Service Instructions Manual

Carrier 50ZP036 Installation, Start-Up And Service Instructions Manual

3-phase single-packaged air conditioners
Hide thumbs Also See for 50ZP036:

Advertisement

50ZP036-060
3-Phase Single-Packaged
Air Conditioners
Visit "vv'vv'vv.
12 _ lr r i_r.L" oin
installation, Start-Up and Service instructions
HEATING
& COOLING
NOTE:
Read the entire instruction
manual belk_re starting the
installation.
TABLE OF CONTENTS
SAFETY CONSIDERATIONS
.....................................................
l
INTRODUCTION
..........................................................................
2
RECEIVING AND INSTALLATION
..........................................
2
Check Equipment ......................................................................
2
IDENTIFY UNIT ................................................................
2
INSPECT SHIPMENT ........................................................
2
Provide Unit Support ................................................................
2
SLAB MOUNT ...................................................................
2
Provide Clearances ....................................................................
2
Place Unit ..................................................................................
2
Select and Install Ductwork .....................................................
2
INSTALL
FLANGES
FOR
DUCTWORK
CONNEC-
TIONS (50ZPI)6t) ONLY) ...................................................
2
CONVERTING HORIZONTAL
DISCHARGE UNITS TO
DOWNFLOW
(VERTICAL) DISCHARGE ...................... 6
Provide lk_rCondensate Disposal .............................................
6
Install Electrical Connections ...................................................
7
.................................. 7
ROUTING POWER LEADS INTO UNIT ........................ 8
CONNECTING
GROUND LEAD TO UNIT GROUND.8
ROUTING CONTROL POWER WIRES .......................... 8
HEAT WIRING ..................... 8
............................................................................
9
START-UP .....................................................................................
9
Check lor Refl'igerant Leaks ....................................................
9
CHARGE THE UNIT AS FOLLOWS: ............................. 9
Refrigerant Charge ..................................................................
10
NO CHARGE ....................................................................
10
LOWCHARGE
COOLING ...............................................
10
TO USE COOLING CHARGING CHARTS .................. 10
Indoor Airflow and Airflow Adjustn-ients .............................. 10
FOR 208/230-V .................................................................
11
FOR 460-V MOTORS ......................................................
11
Unit Controls ...........................................................................
l l
RELIEF VALVE ............................... 11
COMPRESSOR
OVERLOAD ..........................................
11
Sequence of Operation ............................................................
11
FAN OPERATION ............................................................
11
COOLING ..........................................................................
11
HEATING ..........................................................................
11
MAINTENANCE .........................................................................
12
Air Filter ..................................................................................
16
Unit Top Removal (Condenser-Coil
Side) ............................ 16
C00155
Fig. liUnit
50ZP
Evaporator Blower and Motor ................................................
16
Condenser Coil, Evaporator Coil, and Condensate Drain Pan. 16
Condenser Fan ........................................................................
17
Electrical Controls and Wiring ...............................................
18
Reli"igerant Circuit ..................................................................
18
Evaporator Airflow .................................................................
18
Metering Devices ....................................................................
18
Liquid Line Strainer ................................................................
18
TROUBLESHOOTING
...............................................................
18
START-UP CHECKLIST ............................................................
18
NOTE TO 1NSTALLER--Belk_re
installation,
READ THESE
INSTRUCTIONS
CAREFULLY
AND
COMPLETELY.
Also,
make sure the User's Manual and Replacement Guide are leli with
the unit after installation.
SAFETY CONSIDERATIONS
Installation
and servicing of air-conditioning
equipment can be
hazardous due to systen-i pressure and electrical components. Only
trained and qualified
workers should install, repair, or service
air-conditioning
equipment.
Untrained workers can perlkmn basic maintenance
l_.lnctions of
cleaning coils and lilters. All other operations should be perlbm_ed
by trained service people. When working
on air-conditioning
equipment, pay attention to precautions in the literature, tags, and
labels attached to the unit, and other salk:ty precautions that may
apply.
Follow all sallcty codes. Wear sal_:ty glasses and work gloves. Use
quenching cloth lk_r unbrazing operations.
Have flrc extinguisher
available Ik_rall brazing operations.
Manufacturer
reserves
the right
to discontinue,
or change
at any time, specifications
or designs
without notice
and without
incurring obligations.
PC 101
Printed in U.S.A.
Catalog No. 50ZP-5SI
Pg 1
2-06
Replaces:
New

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 50ZP036 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

50zp04850zp06050zp042

Table of Contents