Sears N9MP1 Installation Instructions Manual page 2

90+ single stage category iv
Table of Contents

Advertisement

Dealer Name:
Address:
City, State(Province), Zip or Postal Code:
Phone:
Owner Name:
Address:
City, State(Province), Zip or Postal Code:
Model Number:
Serial Number:
Type of Gas:
Natural:
Which blower speed tap is used?
(Heating)
(Cooling)
Temperature of Supply Air:
Temperature of Return Air:
Rise (Supply Temp.--Return Temp.): (°F)
Filter Type and Size:
Fan "Time ON" Setting:
Fan "Time OFF" Setting:
Dealer Comments:
2
START- -UP CHECK SHEET
For 90+ Furnace
(Keep this page for future reference)
LP:
(°F)
or(°C)
(°F)
or(°C)
or(°C)
Business Card Here
Manual Gas Shut--Off Upstream
of Furnace/Drip--Leg?
Condensate Drain Connected?
Condensate Drain Trapped?
Transition Pressure switch hose relocated for U/D/H
Application? YES
NO
Blower Speed Checked?
All Electrical Connections Tight?
Gas Valve OK?
YES
Measured Line Pressure When Firing Unit:
Calculated Firing Rate:(See Checks and Adjustments Sec-
tion).
Temperature Rise (supply--return temperature):(°F)
Measured Manifold Gas Pressure:
Static Pressure (Ducts): Supply Air
Date of Start--Up:
CO ?
CO2 ?
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
NO
Return
440 01 1020 02

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9mp2

Table of Contents