International comfort products N9MP1 Installation Instructions Manual page 27

90+ single stage, category iv, gas furnace
Hide thumbs Also See for N9MP1:
Table of Contents

Advertisement

Figure 19
Horizontal Right−Side Vent
Single Pressure Switch Detail
AIR FLOW
Relief Tube
Black Rubber
(4.8mm) ID
Flexible Tubing Connector
(4.8mm) OD (Loose Parts Bag)
Relief Tube Extension
Black Rubber
Cut to Fit (Loose Parts Bag)
Horizontal Right−Side Vent
Disconnect drain tee if installed (N9MPD and *9MPD models only)
Disconnect the hoses from the trap assembly, and remove trap
and trap mounting bracket from the blower compartment. Using
cover plate and gasket provided in the loose parts bag, cover the
hole from the burner compartment to the blower compartment and
secure with screws.
Remove knockout from the side of the furnace casing where drain
tube will exit.
Mount the trap externally to the bottom side of the unit using the
two screws provided in the location shown.
Cut the corrugated tube as shown in the illustration above.
Connect the corrugated hose from the transition to the trap.
Secure connections with clamps.
1
Connect the black
/
" (12.7mm) ID drain tube from the Vent Drain
2
to the trap. If an extension is required, use the
barbed coupling and the black
loose parts bag. Cut tube to length. Secure connections with
clamps.
3
Connect the
/
" (4.8mm) ID relief tube to the middle port on the
16
trap. If an extension is required, use the clear
440 01 1024 04
Trap Connection
Preassemble &
insert into furnace
,
3
/
16
,
3
/
16
, (4.8mm) ID
3
/
16
Dual Pressure Switch
, (15.9mm) ID & Clamps
5
Drain Tube Black,
/
8
Corrugated Cut at straight section
Leave room for clamp
Representative drawing only, some models may vary in appearance.
(See Figure 19)
1
/
" (12.7mm) OD
2
1
/
" (12.7mm) ID drain tube in the
2
3
/
" (4.8mm) OD
16
Specifications are subject to change without notice
Plastic Cap
Yellow or black
"Clamp ears"
Pointed OUT
Vent Drain
& Clamps
Level or Sloped
towards Tee
Remove KO before
mounting Trap
Drain Tube
Black Rubber
, (12.7mm) ID
1
/
2
& Clamps
Cut Here
splice connector and the black
loose parts bag. Cut tube to length.
Cut an appropriate length of 2" (50.8mm) PVC pipe, fittings and
extension pipe long enough to exit the cabinet and connect the
vent drain to either:
A standard field supplied 2" (50.8mm) PVC tee (N9MP1 or
N9MP2 models), or
A 2" (50.8mm) PVC coupling fastened onto the drain tee
(N9MPD and *9MPD models)
Install tee trap into bottom section of tee.
Important: The pipe to the tee trap must be level or sloping towards
the tee trap
Connect the tee trap and the main drain line exiting the casing as
shown in Figure 20.
Note:
It is recommended that all PVC piping and fitting
connections be fit up and inspected before final cementing. Both
the external trap and the external tee trap must be primed
before operation. Verify all condensate drain connections are
securely clamped. A coupling and clamps (in loose part bag) may
be installed as shown for future servicing of the vent system.
Coupling & Clamps
(Optional)
Field
Supplied Tee
Tee Trap
White PVC
(loose parts bag)
Elbow Tube Black Rubber
, (12.7mm) ID & Clamps
1
/
2
(Loose Parts Bag)
On Some Models
ONLY
INLET
Alternate Orientation
, (12.7mm)
1
Barbed Coupling
/
2
OD (Loose Parts Bag)
25−24−70c
3
/
" (4.8mm) ID relief tube in the
16
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9mpdC9mpdH9mpdT9mpdN9mp2

Table of Contents