MGE UPS Systems POWER-SURE 700 Installation And User Manual page 25

Three phase power conditioners
Table of Contents

Advertisement

Power-Sure™ 700 Performance Checklist
9.
Input/Output Voltage Checks (Adjust as needed):
No Load Input
A-B____________VAC
B-C____________VAC
A-C____________VAC
10.
Available Load Input
A-B____________VAC
B-C____________VAC
A-C____________VAC
11.
Input/Output Current Checks (Balance as needed):
Input
A____________Amps
B____________Amps
C____________Amps
12.
Fans Operational:
_________________________________________________________________________________________
13.
Testing Shutdown Circuitry ie...REPO, Over/Under Voltage:
_________________________________________________________________________________________
14.
Comments:
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
86-108814-00 B01
No Load Output
AN____________VAC
BN____________VAC
CN____________VAC
Available Load Output
AN____________VAC
BN____________VAC
CN____________VAC
Output
A____________Amps
B____________Amps
C____________Amps
N____________Amps
G____________Amps
Maintenance
Installation and User Manual
(Continued)
A-B____________VAC
B-C____________VAC
A-C____________VAC
A-B____________VAC
B-C____________VAC
A-C____________VAC
3 —3

Advertisement

Table of Contents
loading

Table of Contents