Sign In
Upload
Manuals
Brands
Alcatel-Lucent Manuals
Gateway
9966
Alcatel-Lucent 9966 Manuals
Manuals and User Guides for Alcatel-Lucent 9966. We have
1
Alcatel-Lucent 9966 manual available for free PDF download: Hardware Installation
Alcatel-Lucent 9966 Hardware Installation (150 pages)
SMALL CELL GATEWAY on ATCA Platform
Brand:
Alcatel-Lucent
| Category:
Gateway
| Size: 2.56 MB
Table of Contents
Table of Contents
3
About this Document
12
Purpose
12
Reason for Reissue
12
New in this Release
13
Safety Information
13
Intended Audience
13
Supported Systems
13
Prerequisites
13
Conventions Used
13
Document Support
13
Technical Support
13
How to Order
14
How to Comment
14
1 Safety and General Information
15
Overview
15
Structure of Safety Statements
16
General Hazard Statements
18
Basic Safety Aspects
22
2 Product Conformance Statements
25
Overview
25
Canada
26
China
28
European Union
29
United States
31
3 Introduction to ATCAV2 Platform
34
Overview
34
ATCAV2 Platform Description
34
Overview
35
Hardware Platform Overview
35
Cabinet Overview
35
Parts List of ATCAV2 Chassis
36
Front and Rear View of SAVA2AC Chassis
38
BSR Gateway on ATCAV2 Platform
40
Hardware Component Description
41
Overview
41
ATCAV2 Cards
42
MALBAN10 Card
42
BONO Card
43
Card Placement in the Front Slots
44
Card Placement in the Rear Slots
44
Slot Numbering
44
Shelf Manager
45
SHMC Card
45
Alarm Board
46
FALARM Card
47
Fillers
48
Cooling Unit
49
Deflectors
50
ATCAV2 Shelf Power Entry Modules
51
Power Entry Modules
51
4 Small Cell Gateway on the ATCAV2 Platform
52
Overview
52
Overview
53
Site Configurations
53
SC01 Configuration
54
Max Configuration in SC01 Cabinet Layout
55
SCE1 Configuration
56
Max Configuration in SCE1 Cabinet Layout
57
ATCA Standalone Shelf (SAS)
58
5 Moving and Unpacking Equipment
60
Overview
60
Lifting the Equipment
60
Lifting Equipment
61
Lift Eyes on Cabinet Top Panel
62
Unpacking Equipment
63
Shelf Packaging
63
Polyethelene Foam Packaging of the Shelf
64
Cabinet Packaging
65
Unpacking Cabinet from Packaging
66
6 Air Cooling Considerations for the ATCAV2 Shelf
67
Overview
67
Airflow Requirements
67
Ventilation Considerations
68
Airflow Within the System
69
Cooling Unit
70
Top Fan Tray (330W Configuration)
70
NDAFF Air Filter
71
NDAFR Air Filter
72
Airflow Requirements
73
Air-Baffles Requirement
74
Air-Baffles for 330W Configuration
75
7 Installation of the Equipment
77
Components Based on 330W Per Slot Chassis Configuration
75
Overview
77
Cabinet and Chassis Installation
77
Overview
78
SC01 and SCE1 Cabinet Installation
78
Cabinet Specifications
79
SAS Chassis Installation
80
Chassis Clearance Requirements
82
Grounding the Equipment
84
Overview
84
Importance of Grounding
85
External Grounding of the SC01/SCE1 Cabinet
86
Earth Connection Point on RRVR
86
Cabinet Grounding Supplies
87
Connecting the Earthing Terminal to the MET
89
Connecting the Earthing Point on RRVR
90
CBN Earthing
91
Floor Insulation Options
92
IBN Earthing
93
Grounding the SAS
94
Chassis Grounding Supplies
94
Grounding the SAS to a Standard 19-Inch Cabinet
95
Cabling and Power Supply
97
Overview
97
Cabling Zones
98
Routing Rules
100
Cabling Zones in the SC01 and SCE1 Layouts
98
Cable Routing and Strands
101
Internal Powering of the SAS
102
SAS Powering Supplies
102
PEM Terminals
104
PEM Cabling
105
Internal Power Wiring of the SC01 and SCE1 Cabinet
106
48V Distribution in the SC01 Cabinet (from CB)
107
48V Distribution in the SC01 Cabinet (from the Fuses)
108
Fuses and CB in the SC01 Rack Layout
109
48V Distribution in the SCE1 Cabinet (from CB)
110
48V Distribution in the SCE1 Cabinet (from the Fuses)
111
Fuses and CB in the SCE1 Rack Layout
112
External Powering of SC01 and SCE1 Cabinet
113
Cabinet Powering Supplies
113
Wiring Schematic of PDU to Customer Power Unit
114
H-Tap Connection between the PDU and Power Taps
116
Connection of the Branch Lines to the Main Power Feeders
117
External Power Cabling for SC01
118
External Power Cabling for SCE1
119
Installing the Cards and RTM
120
Overview
120
8 Initialization Procedures
123
Overview
123
Power Polarity
124
Functional Checks
125
LED Checklist
125
ATCA Backplane Zones
126
ATCA Zones
127
Installing Cage Nuts
128
Cage Nuts Installation
129
Removing the Chassis from the Rack
130
ESD Safety
132
ESD Strap Terminals on the Cabinet and SAV2AC Shelves
133
Final Checklists
134
Overview
134
Using Checklists
135
General Checklist
136
Documentation Checklist
138
Grounding Checklist
139
Wiring Supplies Checklist
141
Cabinet Checklist
143
DC Distribution Panel Checklist
145
Chassis Checklist
147
Glossary
148
Advertisement
Advertisement
Related Products
Alcatel-Lucent 9927
Alcatel-Lucent 9962
Alcatel-Lucent 9500
Alcatel-Lucent OmniSwitch 9800
Alcatel-Lucent OmniSwitch 9600
Alcatel-Lucent OmniSwitch 9700
Alcatel-Lucent OmniSwitch 9700E
Alcatel-Lucent OmniSwitch 9800E
Alcatel-Lucent 9361 Home Cell V2
Alcatel-Lucent 9558HC
Alcatel-Lucent Categories
Switch
Telephone
Network Router
IP Phone
Network Hardware
More Alcatel-Lucent Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL