KitchenAid KGCD807XBL02 Installation Instructions Manual page 6

30" (76.2 cm) gas downdraft cooktop
Table of Contents

Advertisement

Available languages

Available languages

Common
venting
methods
are shown
for a counter-mounted
Concrete
Slab
Installations
-
downdraft
cooktop.
The cooktop
may be vented
through
the wall
Exhaust Through Window Well
or floor.
Option
1 - Roof
Venting
Option
2 - Wall
Venting
B
D
A. Roof cap
B. 6" (15.2 cm) round roof
venting
Option 3 - Venting Between
Floor Joist
A. 6" (15.2 cm) round wall
venting
B. Wall cap
Option 4 - Venting behind
Cabinet Kick Plate
3 ¼" x 10"
(8,3 x 25,4 cm)
A
B
B
A. Wall cap
B. 6" (15.2
cm) round
wall
venting
A. Wall cap
B. 6" (15.2
cm) round
wall
venting
M
A. Wall cap
B. 12" (30.5 cm) minimum
C. Concrete slab
D. 6" (15.2 cm) round PVC sewer pipe
E. 5" to 6" (12.7 cm to 15.2 cm) transition
F. 6" (15.2 cm) round metal duct
G. 6" (15.2 cm) round PVC coupling
H. 6" (15.2 cm) round PVC sewer pipe
I. 6" (15.2 cm) round 90 ° PVC sewer pipe elbow
J. Tightly pack gravel or sand completely
around pipe.
K. 42 ft (12.8 m) max.
L. 6" (15.2 cm) round PVC coupling
M. 6" (15.2 cm) minimum
N. Window well
Concrete Slab Installations - Exhaust Through Wall
B
A. Wall cap
B. 6" (15.2 cm) round metal vent
C. 16" (40.6 cm) maximum
D. 6" (15.2 cm) round PVC sewer pipe
E. 5" to 6" (12.7 cm to 15.2 cm) transition
F. 6" (15.2 cm) round metal duct
G. 6" (15.2 cm) round PVC coupling
H. Concrete slab
I. 6" (15.2 cm) round PVC sewer pipe
J. 6" (15.2 cm) round 90 ° PVC sewer pipe elbow
K. Tightly pack gravel or sand completely
around pipe.
L. 3O ft (9.1 m) max.
M. 6" (15.2 cm) round 90 ° PVC sewer pipe elbow
N. 6" (15.2 cm) round PVC coupling
O. 12" (30.5 cm) minimum
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kgcd807xss02

Table of Contents