PARTS, TOOLS, MATERIALS
YOU WILL NEED THE FOLLOWING TOOLS AND MATERIALS FOR THE INSTALLATION:
Carton or other heavy material for covering the counter top.
Clear tape
(for taping the templates to the wall)
Stud finder or thin nail.
Key hole saw (for the power cord hole)
I
Saber saw (for cutting vent
hloes for roof or wall venting)
Phillips screwdriver (for the screws)
Pencil
Flat blade screwdriver (for the bolts)
3/8" and 3/4" wood drill bits
1/2" and 3/16"
drill bits
Plumb line
Measuring tape (metal preferred)
Duct Tape
Small side cutters or tin snips
Caulking gun
• If you have brick or masonry walls, you need special hardware and tools.
• The ductwork you need for the installation is not included. All wall and roof caps must have a back-draft
damper.