Vent Clearances And Framing; Pipe Clearances To Combustibles; Wall And Ceiling Penetration Framing; Vertical Penetration Framing - Heatilator NBV3630I Owner's Manual

Hide thumbs Also See for NBV3630I:
Table of Contents

Advertisement

8
8

Vent Clearances and Framing

A. Pipe Clearances to Combustibles
Vent clearances are per vent manufacturer's specifi ca-
tions. The vent MUST be Listed B-Vent pipe.
WARNING! Risk of Fire! MAINTAIN AIR space clearance
to vent. DO NOT pack insulation or other combustibles:
• Between ceiling fi restops
• Between wall shield fi restops
• Around vent system
Failure to keep insulation or other material away from vent
pipe may cause overheating and fi re.
Heatilator • Novus B-Vent Series • 4055-188 • Rev. X • 9/15
B. Wall and Ceiling Penetration Framing
For a wall or ceiling penetration consult B-vent pipe
manufacturer's instructions to provide adequate clear-
ances. Use same size framing materials as those used in
the wall or ceiling construction. Firestop spacers must
be used in wall and ceiling penetrations per the B-Vent
pipe manufacturer's specifi cations and national, regional
and local codes.
Note: MUST terminate vertically.
C. Vertical Penetration Framing
WARNING! Fire Risk. DO NOT allow loose materials or
insulation to touch vent. Hearth & Home Technologies re-
quires the use of an attic shield.
The National Fuel Gas Code ANSI Z223.1 and NFPA 54
requires an attic shield constructed of 26 gauge minimum
metal that extends at least 2 in. (51 mm) above insulation.
Attic shields must meet specifi ed clearance and be se-
cured in place.
Use B-vent manufacturer's fi restops to provide adequate
clearances.
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nbv3933iNbv4236iNbv4842i

Table of Contents