Battery Removal And Installation - Suzuki SFV650 Service Manual

Table of Contents

Advertisement

1J-12 Charging System:
2) Measure the battery voltage using the multi-circuit
tester.
If the voltage reading is less than the 12 V (DC),
recharge the battery with a battery charger.
Recharging time
1.2 A for 5 to 10 hours or 5 A for 1 hour
CAUTION
!
Be careful not to permit the charging current
to exceed 5 A at any time.
3) After recharging, wait at least 30 minutes and then
measure the battery voltage using the multi-circuit
tester.
If the battery voltage is less than 12.5 V, recharge
the battery again.
If the battery voltage is still less than 12.5 V after
recharging, replace the battery with a new one.
"A"
"B"
"A": Charging period
4) Install the battery to the motorcycle. Refer to "Battery
Removal and Installation (Page 1J-12)".
I649G11A0045-02
"B": Stop charging
I944H11A0029-01

Battery Removal and Installation

Refer to "Electrical Components Location in Section 0A
(Page 0A-7)".
Removal
1) Remove the seat. Refer to "Exterior Parts Removal
and Installation in Section 9D (Page 9D-4)".
2) Remove the stay (1) and battery holder lid (2).
3) Disconnect the battery (–) lead wire (3).
4) Disconnect the battery (+) lead wire (4).
NOTE
Be sure to disconnect the battery (–) lead
wire (3) first, then disconnect the battery (+)
lead wire (4).
5) Remove the battery (5) from the motorcycle.
3
5
Installation
Install the battery in the reverse order of removal.
Pay attention to following points:
CAUTION
!
Never use anything except the specified
battery.
• Tighten the battery lead wire mounting bolts securely.
• Fix the battery holder lid (1) to the groove of battery
holder.
B944H11A06009
1
4
2
I944H11A0025-03
1
I944H11A0026-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sfv 650

Table of Contents