Installing The Processor And Heatsink; Installing An Lga 2011 Processor - Supero SUPERSERVER 6018R-MT User Manual

Table of Contents

Advertisement

SUPERSERVER 6018R-MT/6018R-MTR User's Manual
5-4

Installing the Processor and Heatsink

Caution: When handling the processor package, avoid placing direct pressure on
the label area of the fan.
Notes:
Always connect the power cord last and always remove it before adding, re-
moving or changing any hardware components. Make sure that you install the
processor into the CPU socket before you install the CPU heatsink.
If you buy a CPU separately, make sure that you use an Intel-certified multi-
directional heatsink only.
Make sure to install the serverboard into the chassis before you install the CPU
heatsinks.
When receiving a serverboard without a processor pre-installed, make sure that
the plastic CPU socket cap is in place and none of the socket pins are bent;
otherwise, contact your retailer immediately.
Refer to the Supermicro web site for updates on CPU support.

Installing an LGA 2011 Processor

1. There are two levers on the
LGA2011 socket. First press and
release the load lever labeled
'Open 1st'.
2. Press the second load lever
labeled 'Close 1st' to release the
load plate from its locked position.
Press down on the lever labeled
Pull lever away
from the socket
5-4
'Close 1st'

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superserver 6018r-mtr

Table of Contents