Commissioning

102
52. Commissioning
To ensure correct operation, we recommend that the system is commissioned by
our customer service department.
A commissioning report with checklist is supplied with every appliance and should
be worked through before commissioning.
The key criteria are:
- Has the appliance been positioned and installed in line with the installation instructions?
- Have all electrical and hydraulic connections been completed in full?
- Are all slides and shut-off valves in the heating water circuit open?
- Have all circuits been flushed and thoroughly vented?
- Is condensate drainage guaranteed?
- Do the power feeds to the compressor, electric heating and control system have
omnipolar fuse protection?
- Before commissioning, it is essential to carry out an function test on the circulation
pump.
3064298_201507