Installation - Sharp MX-M623N Installation Manual

Digital multifunctional system
Hide thumbs Also See for MX-M623N:
Table of Contents

Advertisement

10) Carefully remove the finisher from the pallet.
B. Removal of the fixing member
Remove the tape from the finisher.
Remove the shipment locking material with red note.
1)
Remove the tape and fixing member.
2)
Remove the screw, and remove lift tray rail section transit fix-
ing members (4 positions).
C. Check the packed items
1)
Check that all the items are included in the package.
1
2
7
1
Positioning pin
2
Earth plate
3
Earth mounting plate
4
Rail mounting plate
5
Staple label
6
Screw G (M4 x 8)
2.

Installation

<Note before installation>
* Before starting installation, check to insure that the data lamp on
the operation panel is not on or blinking.
A. Turn off the power of the main unit
1)
Turn OFF the power switch on the operation panel.
2)
Open the front cabinet.
Turn OFF the power switch in the front cabinet of the main unit.
3)
Disconnect the power plug of the main unit from the power out-
let.
MX-M753N MX-FN14 7 – 2
3
4
9
10
1 pc.
7
Screw H (M4 x 14)
1 pc.
8
Screw I (M4 x 18)
1 pc.
9
Staple cartridge
1 pc.
10
Clamp
2 pcs.
11
Power code
3 pcs.
12
Punch position label
5
6
11
12
2 pcs.
4 pcs.
1 pc.
1 pc.
1 pc.
2 pcs.
OFF

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx-m623uMx-m753nMx-m753u

Table of Contents