Technical Data - Potterton Performa 24i HE Installation And Service Instructions Manual

Wall mounted powered flue condensing combination boiler gas fired central heating unit
Hide thumbs Also See for Performa 24i HE:
Table of Contents

Advertisement

4.0

TECHNICAL DATA

4.1
Performa 24i HE
Appliance Type
C
Appliance Category
CAT II
Heat Input CH
Max
Min
kW
24.8
10.6
Heat Output CH (Non-Condensing)
Max
Min
kW
24
9.8
Heat Output CH (Condensing)
Max
Min
kW
25.2
10.1
Heat Input DHW
Max
kW
24.8
Heat Output DHW
Max
kW
24
Max Gas Rate (Natural Gas - G20)
(After 10 mins)
m
3
/h
2.62
Burner Pressure (Natural Gas - G20)
Max Rate
mbar
10.2 ± 0.5
Inlet Pressure (Natural Gas - G20)
mbar
20
Burner Injector (Natural Gas - G20)
15 x 1.18mm Diameter
Electrical Supply
230V~ 50H z
(Appliance must be connected to an
earthed supply)
Power Consumption
170W
External Fuse Rating
3A
Internal Fuse Rating
Fuse 2A Fast Blow to BS 4265
SEDBUK Declaration For Performa 24i HE
The seasonal efficiency (SEDBUK) is 87.3% (89.3% LPG)
Band B
This value is used in the UK Government's Standard Assessment
Procedure (SAP) for energy rating of dwellings. The test data from
which it has been calculated have been certified by 0051.
LPG Propane - G31
Burner Injector 15 x 0.77mm diameter
Burner Pressure
Max Rate
Propane
mbar
21.8 ± 0.5
Inlet Pressures
37
mbar
Publication No. 5111813
C
Electrical Protection
12
32
2H 3P
NO x Class
Condensate Drain
Flue Terminal
Dimensions
Connections
Gas Supply
Central Heating Flow
Central Heating Return
Cold Water Mains Inlet
DHW Flow
Pressure Relief Discharge -
Outercase Dimensions
Casing Height
Overall Height Inc Flue
Elbow
Casing Width
Casing Depth
Clearances
Above Casing
Below Casing
Front
Front
L.H. Side
Min Rate
R.H. Side
2 ± 0.2
*NOTE: The boiler can be operated with a
clearance of 5mm at the right. This is also
sufficient for routine maintenance.
However a clearance of 20mm is required
if it is necessary to remove the secondary
heat exchanger. This should be
considered when siting the appliance and
in the event of any subsequent alterations
in the area of installation
Central Heating Primary Circuit
Pressures
Safety Discharge
Max Operating
Min Operating
Recommend Operating
Min Rate
4.4 ± 0.2
Weights
IPX5D
Packaged Boiler Carton
Installation Lift Weight
3
DHW Circuit
1" BSP
Pressures
Max Operating
Diameter
100mm
Min Operating
Projection
95mm
Min Operating Pressure
copper tails
at 11.1 l/min
-
22mm
-
22mm
Flow Rates
-
22mm
DHW Flow Rate
-
15mm
@ 30
-
15mm
DHW Flow Rate
15mm
@ 35
Min Working
-
780mm
DHW Flow Rate
Pump - Grundfos UP 15-60
-
965mm
Available Head
-
450mm
-
345mm
Expansion Vessel - (For Central Heating
only. Integral with appliance)
200 mm Min
Min Pre-charge Pressure
200 mm Min
450 mm Min
(For Servicing)
5 mm Min
(In Operation)
Max Capacity of
5 mm Min
CH System
5 mm Min
(In Operation)
20mm Min
(See Note*)
Primary Water Content
of Boiler (unpressurised)
Temperatures
C.H. Flow Temp
D.H.W. Flow Temp
bar
3
2.5
0.5
1-2
Pump - Available Head
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0
0
200
400
600
Flow Rate (l/h)
bar
8
0.2
0.9
l/min
o
C Rise
11.5
C Rise
9.8
o
2.5
See graph below
bar
0.5
litre
80
3.2
(adjustable)
35°C to 85°C
(± 5°C)
max
35°C to 65°C
(± 5°C)
max
dependent upon flow rate
50°C Pre-heat OFF
65°C Pre-heat ON ± 5°C
dependent upon flow rate
800
1000
1200
kg
57.5
47
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents