Baxi Barcelona Installation And Servicing Instructions page 17

Wall mounted powered flue condensing boiler gas fired central heating unit
Hide thumbs Also See for Barcelona:
Table of Contents

Advertisement

8.0
Installation – page 17
Fig. 23
8.2
Preparing The Boiler
1.
Remove the outer carton.
2.
Remove the internal packaging.
3.
Lift the outercase upwards and remove (Fig. 23).
Baxi Limited declare that no substances harmful to
health are contained in the appliance or used during
appliance manufacture.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents