These installation instructions provide all the
information needed for positioning the UPS
(including environmental requirements) and for
connecting the input and output power cables.
Inspection
Upon receiving the UPS, examine the packaging
for any signs of mishandling or damage. If any
damage is noted, call your local Liebert
representative and/or notify your carrier.
Environment
Note: Operating in temperatures above 77° F
(25° C) will reduce battery life.
environment
must
be
contaminants and excessive moisture (water
condensation,
flammable
fumes, or corrosive gasses and liquids).
Required Setup Equipment
The tools below are required in order to properly
setup your UPS:
§
Pallet jack
§
1/2" (13mm) ratchet or wrench
§
Torque Wrench (in / lb)
§
Flathead Screwdriver
§
#2 Phillips Screwdriver
Preparation
The UPS
free
of
conductive
vapors,
chemical
11
Site Preparation
When deciding where to locate your UPS,
consider the weight and size of the unit. Make
sure that the structural integrity of the floor can
withstand the weight of a fully loaded unit. Refer
to the table below for size and fully populated
weight considerations:
Model
Max Weight
8 bay
871
12 bay
1186
Check to make sure that your UPS will be
located in a well-ventilated area with at least 12
inches behind it. The UPS is force cooled with
the aid of internal cooling fans.
enters from the front of the UPS and is
exhausted through ventilation grills in the back.
It should also have at least 36 inches in front, in
order to change modules when necessary.
The unit frame is bolted to the shipping pallet to
ensure safety. It is recommended that a pallet
jack be used to transport the unit to its operating
location (prior to unbolting the unit).
H x W x D
40" x 20" x 28"
53" x 20" x 28"
Cooling air