Heat Engine Renewal - IDEAL LOGIC + Combi 24 Installation And Servicing

Hide thumbs Also See for LOGIC + Combi 24:
Table of Contents

Advertisement

69 FLOW ThERMIsTOR REpLACEMENT
1. Refer to Frame 45.
2. Drain down the boiler. Refer to Frame 59.
3. Unplug the electrical lead.
4. Unscrew the thermistor (to facilitate removal a
13mm socket spanner should be used).
5. Fit the new thermistor using the sealing washer
provided.
6. Reassemble in the reverse order.
7. Refill the boiler. Refer to Frame 24.
8. Check the operation of the boiler. Refer to Frames
32-36.

70 hEAT ENgINE RENEWAL

Refer also to Frame 6 - 'Boiler Exploded View'
IMpORTANT
Before starting the removal procedure, protect the gas and
electrical controls with a waterproof sheet or plastic bag.
1. Refer to Frame 45.
2. Drain the boiler. Refer to Frame 59.
3. Remove the fan / venturi assembly and place on one side.
Refer to frame 46.
4. Remove the burner and place on one side. Refer to Frame
48.
5. Remove the ignition and detection electrodes and divertor
actuator head. Refer to Frames 50, 51 and 54.
6. Remove the spark generator. Refer to Frame 52.
7. Remove the gas valve. Refer to Frame 53.
8. Remove the expansion vessel. Refer to Frame 71.
9. Remove the flow thermistor. Refer to Frame 69.
10. Remove the 2 M5 screws retaining the gas valve mounting
bracket and transfer bracket to the new heat exchanger.
11. Undo the inlet pipe union nut and remove the retaining spring
clip and remove pipe.
12. Undo the flow pipe union nut and remove pipe.
13. Remove the condensate rubber pipe. Refer to Frame 55, no. 2.
14. Remove the two heat exchanger fixing screws.
15. Remove the Heat exchanger.
16. Reassemble in reverse order, ensuring the heat exchanger
LH retaining bracket is correctly positioned. Replace any
new 'o' rings supplied with new heat exchanger and replacing
gaskets or seals if any sign of damage is evident. When
replacing the spring clips located on both the flow and return
pipe connections, ensure clip is oriented to correctly match
connecting pipe diameters.
52
SERVICING
3
4
17. Ensure the trap/siphon is filled with water. Refer to
Frame 55.
18. Refill the boiler. Refer to Frame 24.
19. Check operation of the boiler. Refer to Frames 32-36.
10
12
Ideal Logic
+
Combi -
Installation and Servicing
14
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logic + combi 35Logic+ combi 30

Table of Contents