General Layout - Baxi Bermuda BBU 15 HE Installation & Servicing Instructions Manual

Condensing back boiler unit
Hide thumbs Also See for Bermuda BBU 15 HE:
Table of Contents

Advertisement

17
16
15
14
13
12
11
18
PCB Control Box
Calibration Controls
8
© Baxi Heating UK Ltd 2010
Supplied By www.heating spares.co Tel. 0161 620 6677
1
2
10
PCB Control Box
removed for clarity

2.0 General Layout

2.1
1.
2.
3.
4.
5.
3
6.
7.
4
5
8.
9.
10.
11.
12.
13.
14.
6
15.
7
16.
17.
18.
19.
8
The Boiler Control operates the boiler remotely. This is
supplied with the firefront and is fitted, in operation, to the
firefront spacer frame.
IMPORTANT: To commission the boiler it is is necessary
to remove the Boiler Control from the firefront
packaging and connect it to the boiler at the upper right
hand side (item 6).
9
Fig. 3
19
Layout (Fig. 3)
Automatic Air Vent
Flue Connection
Spark Generator
Spark & Sensing Electrodes
Heat Exchanger
Boiler Control Connector
Control Wiring Connector
Condensate Sump
Gas Cock
Condensate Pump
Fan
Drain
Return Connection
Air Sampling Point
Flue Sampling Point
Flow Connection
Condensate Outlet
PCB Control Box (shown removed for clarity)
Boiler Control (cover open)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents