Equalizer Line Installation; Sensing Bulb Installation; Step 3 -- Installing Indoor Expansion Valve - Lennox XC25 Series Manual

Lennox xc25 series outdoor air conditioner unit is designed for use with hfc-410a refrigerant only
Hide thumbs Also See for XC25 Series:
Table of Contents

Advertisement

STEP 3 -- INSTALLING INDOOR EXPANSION VALVE

This outdoor unit is designed for use in systems that include an expansion valve metering device. See the XC25 Product
Specifications bulletin (EHB) for approved expansion valve kit match-ups and application information. The expansion valve
can be installed internal or external to the indoor coil. In applications where an uncased coil is being installed in a field-pro­
vided plenum, install the expansion valve in a manner that will provide access for future field service of the expansion valve.
Refer to below illustration for reference during installation of expansion valve.
INDOOR EXPANSION VALVE INSTALLATION
TWO-PIECE
(Uncased Coil Shown)
PATCH PLATE
(UNCASED
LIQUID LINE
COIL ONLY)
ORIFICE
HOUSING
DISTRIBUTOR
TUBES
DISTRIBUTOR
ASSEMBLY
MALE EQUALIZER LINE
FITTING (SEE
EQUALIZER LINE
INSTALLATION FOR
DETAILS)
Sensing bulb insulation is required if
expansion valve is installed external to the
coil casing. See sensing bulb installation for
bulb positioning.

EQUALIZER LINE INSTALLATION

1.
Remove and discard either the flare seal cap or flare nut with
copper flare seal bonnet from the equalizer line port on the vapor
line as illustrated in the figure below.
2.
Remove the field-provided fitting that temporarily reconnected
the liquid line to the indoor unit's distributor assembly.
FLARE SEAL CAP
STUB
END
EXPANSION
VALVE
TEFLON
RING
®
TEFLON
SENSING
RING
EQUALIZER
LINE
LIQUID LINE
ASSEMBLY WITH
BRASS NUT
VAPOR
LINE
LIQUID LINE
FLARE NUT
COPPER FLARE
OR
SEAL BONNET
MALE BRASS EQUALIZER
LINE FITTING
VAPOR LINE
3.
Install one of the provided Teflon
stubbed end of the expansion valve and use refrigerant
oil to lightly lubricate the connector threads and ex­
posed surface of the Teflon
4.
Attach the stubbed end of the expansion valve to the
liquid line orifice housing. Finger tighten, then use an
appropriately sized wrench to turn an additional 1/2
turn clockwise as illustrated in the figure to the right, or
tighten to 20 ft-lb.
®
5.
Place the remaining Teflon
end of the expansion valve. Lightly lubricate connector
threads and expose surface of the Teflon
refrigerant oil.
6.
Attach the liquid line assembly to the expansion valve.
Finger tighten, then use an appropriately sized wrench
LINE
to turn an additional 1/2 turn clockwise as illustrated in
the figure above or tighten to 20 ft-lb.

SENSING BULB INSTALLATION

1.
Attach the vapor line sensing bulb in the proper orienta­
tion as illustrated below using the clamp and screws
provided.
2.
NOTE - Though it is preferred to have the sensing bulb
installed on a horizontal run of the vapor line, installation
on a vertical run of piping is acceptable if necessary.
NOTE — Confirm proper thermal contact between vapor line
and expansion bulb before insulating the sensing bulb.
3.
Connect the equalizer line from the expansion valve to
the equalizer vapor port on the vapor line. Finger tighten
the flare nut, then tighten an additional 1/8 turn (7 ft-lbs)
as illustrated to the right.
VAPOR LINE
BULB
VAPOR LINE
BULB
NOTE — NEVER MOUNT THE SENSING
BULB ON BOTTOM OF LINE.
FIGURE 6
Page 9
®
rings around the
®
ring.
®
washer around the other
®
ring with
ON LINES SMALLER THAN
7/8",
MOUNT
BULB AT EITHER THE 3 OR
9 O'CLOCK POSITION.
12
BULB
ON 7/8" AND LARGER LINES,
MOUNT SENSING BULB AT
EITHER THE 4 OR 8 O'CLOCK
POSITION.
NEVER
THE
SENSING
12
BOTTOM OF LINE.
BULB
1/2 Turn
11 12
1
2
10
9
3
4
8
7
5
6
1/8 Turn
11 12
1
2
10
9
3
4
8
7
5
6
SENSING
MOUNT
BULB
ON
XC25 SERIES

Advertisement

Table of Contents
loading

Table of Contents