Install The Monitor; Power Cord - Lenovo C52 User Manual

Lenovo computer monitor user's guide
Table of Contents

Advertisement

INSTALL THE
MONITOR
• To connect the tilt/swivel base to the monitor, align
hooks with the sockets on bottom side of the
monitor, and gently push the base towards the front
of the monitor.
• The 15-pin D-shell signal connector on the signal
cable will connect easily to the video adapter
output on your personal computer. Lock both
screws on the connector to ensure a firm
connection.
• Turn the PC power switch ON. Then turn the
monitor power switch ON, by pressing the switch
inward. The green power indicator will light up.
• Allow about 30 seconds for the CRT tube to warm
up. Data will be displayed on the screen.
• If your display fails to function properly, please
first refer to the section "Troubleshooting" in this
manual.

POWER CORD

• Check first to make sure that the power cord
you use is the correct type required for your
area.
• This monitor has a universal power supply that
allows operation in either 100/120V AC or 220/
240V AC voltage area. No user-adjustment is
required.
• First connect the power cord into your
monitor's power input socket, and then plug
the other end into a 3-pin AC outlet. The power
cord may be connected to either a wall socket
or the power output socket on your PC, de-
pending on the type of power cord supplied
with your monitor.
• For units to be used at 120V AC:
Use a UL Listed Cord Set consisting of a min.
No. 18 AWG, Type SVT or SJT three-con-
ductor a maximum of 15 ft. in length and a
parallel blade, grounding type attachment plug
rated 10A, 125V.
• For units to be used at 240V AC (domestic
use):
Use a UL Listed Cord Set consisting of a min.
No. 18 AWG, Type SVT or SJT three-conduc-
tor cord a maximum of 15 ft. in length and a
tandem blade, grounding type attachment plug
rated 10A, 250V.
• For units to be used at 220/240V AC (outside
of U.S.):
Use a Cord Set consisting of a min. No.18
AWG cord and grounding type attachment plug
rated 15A, 250V. The cord set should have
the appropriate safety approvals for the coun-
try in which the equipment will be installed and
marked HAR.
E-3

Advertisement

Table of Contents
loading

Table of Contents